Tenders Are Invited For Construction Work For Swimming Pool-Bundesstadt Bonn: New Building Indoor Pool Kurfürstenbad Bonn As Part Of A Tu Procedure

Tender Detail

95905863
271097-2025
Self-Funded
Tenders Are Invited For Construction Work For Swimming Pool-Bundesstadt Bonn: New Building Indoor Pool Kurfürstenbad Bonn As Part Of A Tu Procedure
NCB
Western Europe
European Union,G20
27-05-2025

Work Detail

Construction Work For Swimming Pool-Bundesstadt Bonn: New Building Indoor Pool Kurfürstenbad Bonn As Part Of A Tu Procedure. The Old Electoral Pool In Bonn Bad Godesberg, Which Was Dismissed In 2016 Due To The Lack Of Operational Safety, Is To Be Completely Dismantled. In The Same Place It Is To Be Rebuilt As A Health Bath. The New Indoor Pool Is To Be Built With The Following Room Program: In Addition To A 25-Meter Swimmer Pool With One And Three Meters Board, A Multifunctional Pool With Lifting Floor, A Teaching And A Childrens Pool Are Intended. The Swimming Offer Is Supplemented By An Approx. 330 M2 Sauna Area With Relaxation Room And Outdoor Area As Well As By Corresponding Sanitary, Social And Adjoining Rooms. The Indoor Pool Is Intended To Cover Part Of The Great Needs Of The Bad Godesberg Schools At Swimming Times. The Ambitious Energy And Technology Concept Provides For The Installation Of Three Air Water Heat Pumps And Water Water Heat Pump. The Associated Physical Boundary Conditions, Power Supply And The Non-Negligible Sound Immissions Are Of Significant Importance In Terms Of Planning And Execution. By Using A Full -Surface Photovoltaic System On The Roof, The Required Electricity Requirement Of 30% Can Be Covered. The Rest Of The Required Electricity Is To Be Covered By 100% Certified Green Electricity Of Stadtwerke Bonn (Swb), Which Means That Supply Will Only Be Possible With Renewable Energies. The Subject Of The Award Procedure Are The Total Entrepreneurial Services (Also Called Tu Services) For: Dismantling Of The Existing Building Building Altes Kurfürstenbad Including Pollutant Renovation, Gutting, Expansion And Securing Of The Paul Magar-Mosaic He Cheerful Day On The Water, Mechanical Above-Ground Dismantling, Creation Of The Complex Construction Pit (Including Special Civil Engineering), Underground Dismantling And The New Building Of The Indoor Pool. All Construction Work Is To Be Awarded Up To The Turnkey Construction And All The Necessary Planning Services Based On This Preliminary Planning (Hoai Performance Phase 2) Of The Previous Object Planner And The Functional Service Description (Flb). The Previous Object Planner Does Not Provide Any Further Services With The Completion Of The Preliminary Planning. The Planning Services Must Be Provided And Coordinated From Hoai Performance Phase 3 For The Areas Of Object Planning, Tga Planning, Structural Engineering, Building Physics And Outdoor Facilities.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail