The Subject Of The Contract Is The Implementation Of Comprehensive Design Documentation And Implementation Of Construction Works For The Investment Task Consisting In The Revitalization Of The Green Area Located At Ul. Paderewski In Lubliniec, As Part Of The Connected Green Space Project, Including: 1) Implementation Of Project Documentation Based On A Functional And Utility Program, Meeting The Requirements Of The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Project Documentation, Technical Specifications For The Implementation And Receipt Of Construction Works As Well As A Functional And Use Program, In The Scope Of Which Includes: A) Construction Project Necessary To Obtain A Building Permit/Notification Of Construction Works, B) Executive Projects In The Field Of Architecture, Construction, Networks And Installations, C) Information On Safety And Health Protection, D) Technical Specifications For The Execution And Acceptance Of Construction Works, E) Obtaining Required By Special Checks, Arrangements, Opinions And Permits, Including Building Permits/Notification Of Construction Works, F). Works Performed At Public Roads. Design Documentation Should Also Meet The Requirements Of The Regulation Of The Minister Of Development Of 11 September 2020 On The Detailed Scope And Form Of The Construction Project. 2) Implementation Of Construction Works Related To The Development Of Areas In The Scope Specified In The Developed And Agreed Project Documentation, In Particular: A) The Implementation Of All Preparation And Security Works, In Particular Regarding Security And Protection, In Particular Health, B) Execution Of All Necessary Notifications And Notifications In The Field Of Industry Infrastructure And Other Resulting From The Provisions Of The Construction Law, C) Geodetic Arrangement Of Works And Full Geodetic Service, D) Earthworks, Leveling And Demolition Works, E) Performing Necessary Care Cuts And Segment, F). With The Provisions Of The Act On Nature Protection And Standards For The Protection Of Trees And Other Greenery In The Investment Process Developed In 2021 By The Eco -Development Foundation And The Landscape Architecture Association (Https://Drzewa.Org.Pl/Standardy/), G). Execution Of An Irrigation, Electrical And Lighting Installation, H) Implementation Of The Reconstruction Municipal Office, I) Execution Of Alleys, J) Execution Of Elements Of Small Architecture, K) All Works Accompanying The Proper Implementation Of This Project. L) Preparation Of As-Built Documentation, M) Cleaning, Security Works, N) Other Works Resulting From The Functional And Utility Program, Arrangements, Design Documentation, Building Art And Legal Provisions. 3) Transfer To The Ordering Party The Finished Object Together With As-Built Documentation, 4) Conducting Work Related To The Care And Maintenance Of The Consumed Plants Within 12 Months Of The Final Acceptance Of The Contract. The Scop
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.