The Subject Of The Order Are Works Related To The Preparation Of Project Documentation And The Implementation Of The Renovation Of The 4C, 5A Sector Rooms And The 209 Of The Tychy City Hall At Al. Niepodległości 49. The Electrical Work Should Be Carried Out In Accordance With The Attached Construction And Performance Project Entitled: Renovation Of The Electrical Installation In The Building Of The Tychy City Hall At Al. Independence ”By Edward Pisz. The Company Of The Functional And Utility Program Includes: Door Joinery,- Painting Walls And Ceilings,- Replacement Of The Entire Sector Floors,- Replacement Of Lighting,- Execution Of Rooms And Markings For A Womens Toilet,- Removing A Closed Computer Network With Fuses,- Execution Of Additional Electrical And Logic Points,- Liquidation Of Closed Telephone Sockets,- Disassembly Of Wardrobes,- Purchase With Configuration Of The Switch For The Sector 5A,- Robots Related To The Door Joinery In Sector 5A:- Wetting The Door Between The Rooms 509 And 509A,- Shift Of The Room Door 511 And 508,- Removal Of The Door Between The Corridors With The Wall, Room 209:- Painting Walls And Ceiling,- Replacement Of The Carpet Sheet,- Execution Of A New Electrical And Logical Point,- Replacement Of Lighting. Inspection Of The Place Of Planned Investment At The Stage Of Preparing The Offer To Check The Conditions In The Field. The Functional And Utility Program Together With The Construction And Performance Design Is Annex 4 To Swz.1. In The Case Of Indications In The Documents Of The Order Of Trademarks, Patents Or Origin, Source Or Special Process, Which Characterizes The Products Or Services Provided By A Specific Contractor, The Contracting Authority Allows The Use Of Equivalent Materials Described. 2. In The Event Of An Indication In The Description Of The Subject Of The Order Of Reference To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Para. 1 Point 2 And Para. 3 Of The Pzp Act, The Contracting Authority Allows Equivalent Solutions Described. 3. The Contractor, Who Refers To Equivalent Solutions, Is Obliged To Show That The Solution He Offers Meets The Requirements Set By The Contracting Authority. In This Case, The Contractor Attach To The Offer Documents Confirming The Equivalence Of The Offered Solutions. The Burden Of Proving Equivalence Rests With The Contractor. The Contractor Shows Equivalence Using Any (Reliable) Measures. Failure To Equalize Results In The Rejection Of The Offer As Incompatible With The Terms Of The Order.Cd. From Point 7.43) § 15 Para. 3 Points A-Dw Cases Of Circumstances Referred To In Para. 1, The Parties Set New Deadlines For The Performance Of The Subject Of The Contract Taking Into Account The Impact Of These Circumstances On The Date Of Implementation Of The Subject Of The Contract, I.E. A) In Relation To The Circumstances Specified In Para. 1 Lit. A - D And Lit. H And Lit. And The Deadline May Be Changed By Th
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.