Repair And Maintenance Services Of Measuring Apparatus Maintenance Of Measuring Equipment 2025. The Successful Tenderer Must Ensure That The Tmh1 Type Tmh1, 60 Tonne And Tmh1 -Type 80 -Tonne, And Tmh6 Type, And Tmh6, To Be Operated By The Hungarian Road Nonprofit Zrt. Contribution To The Authentication Procedure, - Coordinating Its Maintenance, - The Maintenance Of Its Environment Until The Date Of Exhaustion Of The Net Budget (Net Huf 120,000,000), But At The Latest Until The Contract Entry Into Force, The Entire Territory Of Hungary. The Maintenance And Repair Work Priced In The List Of The Technical Description Attached As An Annex To The Technical Description In The Management Of The Contracting Authority And Later On The Measuring Stations And The Surroundings Of Their Surroundings Should Be Under Construction, Installation, Pavement System, Drainage System, Corrosion Coatings, To Do So. The Contracting Authority Shall Provide Detailed Technical Specifications For Specific Work, If Necessary, When Requested For Ad Hoc Work. The Detailed Technical Description Must Be Done At The Unit Price Specified In The Tender. Total Quantity: 36 Bridge Scales And 41 Dynamic Shaft Load Measuring Equipment. The Exact Location Of The Measuring Equipment Is Shown In The Measuring Station List Attached To The Technical Description. The Contracting Authority Hereby States That All Measuring Stations On The List Have A Dynamic Shaft Load Measurement (2 Pieces On The Entry Side), But There Is No Bridge Balance On The Yard Or On The Right And Left. For More Information On The Tasks To Be Performed During The Contract, The Technical Description Contains. Duration Of The Service: From The Entry Into Force Of The Contract, Until The Net 120,000,000,- Huf + Vat Is Exhausted, But At The Latest Until The Last Day Of 12 Months Of The Date Of Entry Into Force. The Contracting Authority Shall Inform The Winner Of The Extension In Writing Within 15 Calendar Days Prior To The Expiry Of The Original Deadline. The Extension Of The Prices Offered Only In The Draft Contract 8.8. Of This Case. The Contracting Authority Undertakes To Order 70 %Of The Amount. For The Contracting Authority, The Remaining 30 %Of The Available Amount Is Not A Drawing (Order) Obligation, So The Contracting Authority Does Not Undertake To Submit A Drawing (Order) To The Services That Can Be Ordered From That Amount Under His Or Her Order. The Contracting Authority Has A Unilateral Written Declaration To Be Eligible For The Remaining 30%Of The Amount
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.