Ground Investigation Services - Geotechnical Missions For The Construction Of The Bayonne Prisse Chart Network Boiler Room. The Dimensioning Elements Explained Below Are Provisional, The Final Elements Will Be Indicated In The Phase Offer Consultation Documents. As Part Of The Realization Of An Energy Central Boiler Room Composed Of A Heat Pump Drawing Lénergie From Ladour And A Biomass Boiler, Dalkia Initiates A Consultation To Make Designing And Carrying Out Wolf. It Will Be Broken Down Into Several Technical Batches. Considering The Above, The Master Douvrage, Dalkia Wishes To Entrust The Holder With A Mission Of Geotechnical G4, As Part Of The Work Of The Works And Equipment. The Boiler Room Will Include A Heat Pump From 1600 Kw To Its Condenser, A Pumping Station With A 300M Denviron Network To Draw Water From Ladour, A Denviron 1200 Kw Biomass Boiler And A 5000 Kw Gas Boiler. The Energy Power Station Will Have A 500 M² Of Environ Surface. On The Basis Of Geotechnical And Hydrogeological Data Provided By A Documentary Survey And By Darchive Data (Bdss, Ades Etc ...), The Geotechnician Will Give The Recommendations Of Avp Phase For The Building Construction Project; These Recommendations Will Comply With Those Defined By The Nfp 94-500 Standard. Following This Last Standard In November 2013, The Mission Will Be Of Type G2 Pro. The Services Can Be Cut Into A Firm Edge And One Or More Optional Slices Which Will Then Be Defined In The Dce Offer.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.