Quotation Are Invited For Removal And Refixing Of Insulation

Tender Detail

95809899
2332501020
Self-Funded
Quotation Are Invited For Removal And Refixing Of Insulation
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
30-04-2025

Work Detail

Quotation are invited for Removal and Refixing of Insul 1032501993 Removal and refixing of insulation for inspection purpose in B2A <(>&<)> B2B Boilers at E-Station. for technical query contact: Ahmed El sherbeny: ahmed.elsherbeny@dewa.gov.ae, +971525657754 Ibrahim Shuhail: ibrahim.alqa@dewa.gov.ae, +971503455524 1 ITEM-00001 INSULATION REMOVAL & RE-FIXING INCLUDING SURFACE CLEANING MECHANICALLY,INSULATION ROD WELDING AND CLADDING SHEET ON BOILER CASING OR WHERE EVERREQUIRED SUCH AS FLUE GAS DUCT, STEAM DRUM, BOILER TUBES, STEAM PIPELINES & OTHER AREAS FOR INTEGRITY INSPECTION OF BOILE R. TOTAL SURFACEAREA OF INSULATION REMOVAL & RE-FIXING IN AUXILIARY BOILER B-2A & B-2BIS APPROXIMATE 150SQ.MATER/BOILER AS PER ATTAC HED SCOPE OF WORK.SCOPE OF WORK:-1. VISIT THE SITE AND UNDERSTAND THE SCOPE & DIFFICULTIES BEFORE PROVIDING QUOTATION.2. REMOVA L OF CLADDING SHEETS FROM BOILER CASING, FLUE GAS DUCT, STEAMDRUM & STEAM PIPELINES PIPES OR CASING WHEREVER MARKED.3. REMOVAL OF I NSULATION FROM BOILER CASING, FLUE GAS DUCT, STEAM DRUM& STEAM PIPELINES OR AS REQUIRED TO THIRD PARTY.4. CLEAN THE INSULATION REMO VED SURFACE WITH PROPER TOOL AS PERREQUIREMENT.5. KEEP THE INSULATION /CLADDING SHEETS IN SAFE PLACE AS PER DEWA ENGINEER INSTRU CTIONS.6. FIX THE INSULATION ROD/PINS/STUDS BROKEN OR DAMAGE OR AS PERREQUIREMENT TO INSTALL THE INSULATION PROPERLY.7. RE-FIX THE OLD/NEW INSULATION AS EXISTS IN ITS PREVIOUS CONDITION AND THICKNESS WILL REMAIN SAME.8. PROVIDE CLADDING SHEETS WITH NEW SCRE WS AND BANDS AS PER ORIGINAL.9. DISPOSE OLD INSULATION IN RED BAGS AS PER DEWA ENGINEER INSTRUCTIONS.10. HOUSEKEEPING TO BE D ONE ON DAILY BASIS.11. PAYMENT WILL BE GIVEN AS PER ACTUAL WORK QUANTITY COMPLETED AT SITE.CONTRACTOR#S SCOPE OF WORK:--1. MOBILIZA TION OF MANPOWER WITH THE FOLLOWING-- A) TRANSPORT FOR WORKING STAFF. B) STAFF 150 M2 SITTING AREA (CONTAINER OR PORTA CABIN OR PREPA RED WITH SCAFFOLDING & COVERED WITH TARPAULIN). C) ECO TOILETS INCLUDING DISPOSAL ARRANGEMENT. D) DRINKING WATER.2. ALL KINDS OF TOOLS AND EQUIPMENT SUITABLE FOR JOB.3. ALL KINDS OF PPE SUITABLE FOR JOB.DEWA SCOPE:--1. SUPPLY OF INSULATION & CLADDIN G MATERIALS REQUIRED.2. DISPOSAL OF SCRAP & INSULATION FROM THE WORK PLACE.CONTACT PERSON: AHMED EL SHERBENY: AHMED.ELSHERBENY@DEWA .GOV.AE,+971525657754/ IBRAHIM SHUHAIL: IBRAHIM.ALQA@DEWA.GOV.AE, +971503455524 2 ITEM-00001 INSULATION REMOVAL & RE-FIXING INCLUDING SURFACE CLEANING MECHANICALLY,INSULATION ROD WELDING AND CLADDING SHEET ON BOILER CASING OR WHERE EVERREQUIRED SUCH AS FLUE GAS DUCT, STEAM DRUM, BOILER TUBES, STEAM PIPELINES & OTHER AREAS FOR INTEGRITY 150 M2 INSPECTION OF BOILE R. TOTAL SURFACEAREA OF INSULATION REMOVAL & RE-FIXING IN AUXILIARY BOILER B-2A & B-2BIS APPROXIMATE 150SQ.MATER/BOILER AS PER ATTAC HED SCOPE OF WORK.SCOPE OF WORK:-1. VISIT THE SITE AND UNDERSTAND THE SCOPE & DIFFICULTIES BEFORE PROVIDING QUOTATION.2. REMOVA L OF CLADDING SHEETS FROM BOILER CASING, FLUE GAS DUCT, STEAMDRUM & STEAM PIPELINES PIPES OR CASING WHEREVER MARKED.3. REMOVAL OF I NSULATION FROM BOILER CASING, FLUE GAS DUCT, STEAM DRUM& STEAM PIPELINES OR AS REQUIRED TO THIRD PARTY.4. CLEAN THE INSULATION REMO VED SURFACE WITH PROPER TOOL AS PERREQUIREMENT.5. KEEP THE INSULATION /CLADDING SHEETS IN SAFE PLACE AS PER DEWA ENGINEER INSTRU CTIONS.6. FIX THE INSULATION ROD/PINS/STUDS BROKEN OR DAMAGE OR AS PERREQUIREMENT TO INSTALL THE INSULATION PROPERLY.7. RE-FIX THE OLD/NEW INSULATION AS EXISTS IN ITS PREVIOUS CONDITION AND THICKNESS WILL REMAIN SAME.8. PROVIDE CLADDING SHEETS WITH NEW SCRE WS AND BANDS AS PER ORIGINAL.9. DISPOSE OLD INSULATION IN RED BAGS AS PER DEWA ENGINEER INSTRUCTIONS.10. HOUSEKEEPING TO BE D ONE ON DAILY BASIS.11. PAYMENT WILL BE GIVEN AS PER ACTUAL WORK QUANTITY COMPLETED AT SITE.CONTRACTOR#S SCOPE OF WORK:--1. MOBILIZA TION OF MANPOWER WITH THE FOLLOWING-- A) TRANSPORT FOR WORKING STAFF. B) STAFF SITTING AREA (CONTAINER OR PORTA CABIN OR PREPA RED WITH SCAFFOLDING & COVERED WITH TARPAULIN). C) ECO TOILETS INCLUDING DISPOSAL ARRANGEMENT. D) DRINKING WATER.2. ALL KINDS OF TOOLS AND EQUIPMENT SUITABLE FOR JOB.3. ALL KINDS OF PPE SUITABLE FOR JOB.DEWA SCOPE:--1. SUPPLY OF INSULATION & CLADDIN G MATERIALS REQUIRED.2. DISPOSAL OF SCRAP & INSULATION FROM THE WORK PLACE. STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332501020)/$value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail