Tenders Are Invited For Road Sweepers - K24259 To Purchase Communal Trucks

Tender Detail

95725731
261120-2025
Self-Funded
Tenders Are Invited For Road Sweepers - K24259 To Purchase Communal Trucks
NCB
central europe
European Union
23-05-2025

Work Detail

Road Sweepers - K24259 To Purchase Communal Trucks. K24259 Purchase Of New Communal Trucks And Service Service 8 Pieces Of 4X4, Min. 15 Tons Of 4X4 Wheel Formula, Replacement New Communal Truck (Target Machine), Euro 6 Environmental Rating 3 Pcs 6X6 Drive, Min. 25 Tonnes Of 6X6 Wheel Formula, Replacement New Truck (Target) Euro 6 Environmental Rating Duration Of The Contract: Actual Duration Of Transportation + Actual Duration Of Transportation + Mandatory Warranty + Exceeding. The Successful Tenderer Is Also Responsible For Conducting The Operation/Function Test, The Commissioning Of The Contracting Authority (At Least 4 Hours Per Machine Per Machine, For A Maximum Of 6 Hours Per Machine, For A Maximum Of 6 Hours Per Machine). Detailed Technical Requirements Are Included In The Technical Description Of The Public Procurement Documents. Elements Of Each Vehicle: 8 Pieces Of 4X4 Drive, Min. 15 Tons Of 4X4 Wheel Formula, Replacement Structure For New Communal Trucks: 8 Core Machines + 6 Tilt Replacement + 8 Summer (Sprinkler) Structure + 8 Laundry + 8 Winter (Spray) Structure + 8 Foreheads + 2 Db 6X6 Shoot Formula, Min. 25 Tons Of 6X6 Wheel Formula For Replacement New Trucks: 3 Core Machines + 3 Summer (Watering) Superstructure + 3 Pc + 3 Winter (Spray) Superstructure + 3 Foreheads + 3 Side Snow + 1 Water Type Certificate Must Be Presented By The Successful Tenderer At The Latest At The Time Of Conclusion Of The Contract, And It Is Necessary To Declare The Tender. On New Vehicles/Base Machines (Target Machines), The Contracting Authority Understands: - Basic Machines Can Only Be New Means Of Transport Not Used Anywhere Before Delivery. For Basic Machines, Act Cxxvii Of 2007 On Value Tax, Which Is Not Used Anywhere Before The Delivery, No. 259 (259 (A) Of The Act Of Act No. 259. - In Addition, The Official Technical Examination Date Shall Not Be Older Than 6 Months. During The Official Technical Exam, The Vehicles Primary, Secondary, If There Is A Tertiary, Must Enter The Technical Data Sheet. Contracting Authority Understands The Following For New Structures/Adapters On A New Device: - The Building Clock Shall Not Be More Than 40 Hours And/Or The Production/Adapter Manufacturing Time Shall Not Be Older Than 6 Months (Certificate Must Include The Number Of The Base/Superstructure - The One -On -One) Warranty By The Tenderer, - Non -Injured (Repair Of Transport Injury By Factory Technology). With A Warning Of The Vehicles, Lev

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail