The Subject Of The Public Procurement Is Construction And Assembly Works For The Site: Lighting Of Pedestrian Paths On The Territory Of Harmanli . 2.2. A Brief Description Of The Public Procurement The Public Procurement Includes The Implementation Of Infrastructure Measures For Safe Urban Mobility In The City Of Harmanli, Aimed At Vulnerable Road Users - Pedestrians And Cyclists, Incl. Implementation Of Lighting Activities Of 31 Pcs. Pedestrian Paths On The Territory Of Harmanli, Filled With 73 Pcs. Steel Pillars (H = 5M) With A Solar Island Lighting System For Each Pillar, Without A Cable Connection Between The Pillars And Without The Need To Join The Electricity Distribution Network. Construction Is The Sixth Category, According To Art. 137, Para. 1, Item 6 Of The Spa. It Is Envisaged To Install An Led Street Lamp On Any Pillar, Which Will Be Powered By Solar Panels. The Activities Are In Implementation Of The Project Implementation Of Integrated Measures For Sustainable Urban Mobility On The Territory Of Haskovo, Svilengrad And Harmanli Under The Procedure Bg-Rrp-8.013 Environmental Mobility Under The National Plan For Recovery And Sustainability Of The Republic Of Bulgaria. According To An Analysis Of The Safety State Of Traffic On The Roads Of 40 Urban Municipalities From 6 Regions For Level 2, The Implementation Of Pedestrian Path Illumination Activities, To Bring Them Into Compliance With The Regulatory Requirements, In The Territory Of The City Of Harmanli, Is Mandatory. The Place Of Execution Of The Public Procurement Is The Territory Of Harmanli, Harmanli Municipality, Haskovo District. The Deadline For Implementation Of The Construction Works May Not Be Shorter Than 120 (One Hundred And Twenty) And Longer Than 180 (One Hundred And Eighty) Calendar Days. The Deadline For Implementation Of The Construction Works Begins To Run From The Date Drawing And Signing Of Section Ii “Determination Of The Construction Line And Level Of Construction” From The Protocol For The Opening Of The Construction Site And Determination Of The Construction Line And Level For The Construction (Annex No. 2, Para 3, Item 2 And Time Of 31 July 2003 For The Drafting Of Acts Of The Final Acceptance And Delivery Protocol For The Acceptance Of The Construction Without Remarks By The Contracting Authority.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.