Road Construction Works - Rehabilitation On Sfo 2323 / I - 8 / Ihtiman - Motel Ihtiman. The Rehabilitation Section Of The Sfo 2323 Municipal Road Starts From A Junction With A Republican Road I-8 And Ends At The Intersection Before The Parking Lot Of Ihtiman Motel. Its Length Is 1982,76M. The Road Has One Lane In Each Direction, And The Flooring Is Asphalt. Its Width Is Variable, And In Most Of Its Length It Has Bilaterally Spaced Drainage Trenches. The Aim Is To Suspend The Process Of Destruction And To Guarantee The Load -Bearing Capacity, Equality And Drainage From Surface Water.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.