Engineering Design Services - Conversion Calling Pumping Pumping Claring Plant Peterslahr - Planning Services Of The Performance Components Engineering Structure, Structural Engineering Planning And Technical Equipment. The Background Of The Peterslahr Sewage Treatment Plant Must Be Renewed Due To Age. At The Same Time, It Was Found In The Context Of A Feasibility Study That The Return Sludge Promotion Is Currently Too Low And That It Is Not Possible To Exploit The Investment Pool Volumes For Both Dry And Rainy Weather. Therefore, The Enclosed Feasibility Study Of The Return Sludge Förde/Return Sludge Distribution And Excess Sludge Promotion On The Peterslahr Sewage Treatment Plant Was Given. The Municipal Community Works Intend To Implement The Preferred Variant (Variant 1), Parallel Operation Of The Two Promotion Pools, Preparation Of An Extension Of The Basement. The Planning Services For The Conversion Of The Peterslahr Sewage Treatment Plant According To The Above Variant Are Hereby Requested. The Planning Services Must Be Provided In Such A Way That The Completion Of The Service Phase 6 Is Ensured By 01.03.2026.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.