Disassembly Of The Wall 40 Cm Thick, Discharge Of Unusable Concrete Mounts, Excavation Of Soil And Collapsed Parts, Given The Sand-Gravel Troubles, Issuance Of The Soil To The Dug, Excavation Of Unusable Foundation, 40 Cm Thick Of Sawdust And Walls And Cost Of Walls, F-16 Fixture 4 Ore Touch And Cost, 35X35 F8 Xamut, Disconnection Of Useless Coats, Disassembly Of Useless Steppe, F-12 Armatur Receipt, The Tona-Water Of The Next Floors Weas Can Be Thewait Of The Pine Tree., The Issuance And Cost Of B-20 Concrete
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.