Tabii Sharp Grounds Cross 79 (108) Kvt (A.G.) Cutting Of The Bushes And Small Forests On The Tractor In The Tractor: Central, The Power Of The Capacity, Which Includes Stumps, Small Woods And Roots With Stumps, Small Woods And Roots With The Capers, The Capacity Of 59 (811) Kwt (A.G.)., Drilling The Ground By Transporting The Ground To 10 M, Buldozers Capacity 96 (130) Kw (A.G.) 2Nd Group Grow. (The Cutting Of The Bridge), Add To The Norm Of Each Of The Next 10 M Of The Soil: 01-01-031-2, Establishment Of Channel And Dams With Birchalovs Excavator, Group: 2 (Drilling A Temporary Transmission Channel With The Repair Of The Existing Channel), Establishment Of Channels And Dams With Birchalov Excavator With 0.65 (0.5-0.8) Of The Chalovunis Capacity, Group Of Group: 2 (Canal Cleaning), The Capacity Of The Chain Of 0.65 (0.5-1), The Excavator Of The Grave With The Excavator To Load The Ground In The Cars, Group 2., Cargo Transportation Of Cargo With Carposes Operating Outside The Caret With A Cargo Capacity Of 10 Tons. 5 Km Of Transportation Distance. 1St-Grade Load, Quality Compression Of Casting Cushion, Chalovunıs Capacity Of 0.65 (0.5-0.8) M3 Of The Gentle Drilling Of The Ground (Channel Project Channel) Group 2., Manual Planning Of The Bottom And Slopes Of The Canal Drilled, Group Group 2., Set Six Fundamentals: Sandy (T = 10 Cm), Should School Foundation Of The Following: Gravel (T = 10 Cm), B12, Fastening Of The Monolithic Reinforcement Of The Bottom Of The Va Slopes With 16 T-Lucy Caterpillar Cranes, B12.5 (M150)), Ø8 Aiii (A500) Fixture For Monolith Reinforced Concrete Structures
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.