Heating, Ventilation And Air Conditioning Installation Work-Peter Härtling School Neubau Primary School With Sports Hall. Heat Generation Plants School / Cafeteria 2 Pieces Brine / Water Heat Pump 1 Piece Of Buffer Memory 2 Pieces Expansion Vessel 80 Ltr. 1 Piece Of Expansion Vessel 250 Ltr. 1 Piece Of Distributor Including All Barriers, Setback Flaps, Dirt Traps, Heat Meter, Pumps, Control Valves 917 M Heating Lines From Non -Rusting Steel Pipes Welded, Material 1,4520 Dn 12 - Dn 80 Including Shape And Connecting Pieces 18.670 M Surface Heating Pipe Incl. Heating Circuit Distributor, Actuator New Building Sports Hall 1 Piece Of High Temperature Heat Pump For Hot Water Preparation 2 Pieces Of Fresh Water Stations Including Buffer Tank 2 Piece Of Hot Water Modules 1 Piece Of Distributor Including All Barriers, Setback Flaps, Dirt Traps, Heat Meter, Heat Quantities, Control Valves 506 M Heating Pipes From Non -Rusting Steel Pipes Welded, Material 1.4520 Dn 12 - Dn 80 Including Shape And Connecting Pieces 3.119 M Surface Heating Pipe Including Plastic Pipes, Compounds, Screw Connections, Heating Circuit Distributors, Actuators
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.