1. The Subject Of The Contract Is The Execution Of Construction Works Consisting In The Reconstruction Of The Internal Municipal Road In Msc. Sadowa, Commune Brzeziny. 2. The Scope Of The Subject Of The Contract Includes, In Particular: - Performing Demolition Works Of Road Elements, - Protection Of Underground Teletechnical And Power Lines, - Socking And Execution Of Embankments, - Construction Of A Bituminous Road With A Width Of 2.50 M To 3.50 M Of Construction Indicated In The Design Documentation And A Double -Sided Road Aggregate From 0.25 M To 0.25 M M, - Reconstruction Of Existing Conventions And Adjusting The Altitude Of All Foreign Devices And Existing Conventions With Paved And Unpaved Surfaces, Referring To The Edge Of The Rebuilt Roadway And Exits And To The Adjacent Area, - Regulation Of Infrastructure Devices Of Underground Equipment, Replacement Of Above -Ground Hydrants To Underground, - Installation Of Traffic Safety, - Humus Roads. Mb.3. Due To The Fact That Poviat Road No. 2938E Is Covered By A Guarantee In Connection With The Investment Entitled Renovation Of Roads In The Brzezinski Poviat Together With The Purchase Of Equipment For Maintaining Poviat Roads Carried Out By The Brzezinski Poviat, It Is Required To Make Arrangements With The Contractor Of The Works In Question In The Scope Of Performing Works Within The Inclusion Of The Poviat Road. 4. The Detailed Scope Of The Contractors Duties Was Included In The Contract Template Constituting Annex 2 To Swz. 5. A Detailed Description Of The Subject Of The Contract Can Be Included In Annex 1 To Swz. The Following Documents Include: 1) Design Documentation, 2) Technical Specification Of The Implementation And Acceptance Of Construction Works (Stwiorb), 3). The Works Orders. Nothing That The Contractors Remuneration Indicated In The Offer Will Be A Flat -Rate Nature, The Contractor Should Be Based On The Scope Indicated In The Design Documentation Referred To In Point 1) And Stwiorb. The Bill Of Quantities Is Auxiliary. Speech During The Implementation Of The Contract Not Included In The Prejudice Or Works In A Larger Amount In Relation To The Pre -City Adopted In The Pre -City Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Project Documentation Referred To In Point 1) Or Stwiriorb.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.