3 Installation Of Renewable Energy Sources On Public Facilities In The Szczekociny Commune. 2. All Objects Constitute Infrastructure Of The Supply Of Population And Educational Water, Of A Public Utility For The Local Community. Each Installation Will Produce Energy For The Own Needs Of The Facility. Each Facility Is Connected To Osd And Has Its Own Electrical Installations With Electricity Receivers. 3. The Ordering Party Divides The Contract Into 2 Parts: 1) Part 1 - Installation Of Renewable Energy Sources On Public Facilities In The Szczekociny Commune - Educational Facilities. Micro -Installations At The Primary School No. 1 In Szczekociny (Installation Power 13.28 Kwp). 4. The Contractor, Based On A Functional And Utility Program (Pfu), Will Prepare Appropriate Design Documentation, And Will Obtain The Necessary Permits In Turn, Make The Required Arrangements, Obtain The Required Administrative Or Technical Consent. Then, Using Own Materials, The Contractor Will Carry Out The Installation, Which Means That They Will Assemble Them And Connect Them To Existing Construction Installations Of Facilities, Perform The Required Checks Or Acceptance, Connection And Start Of Installations Being The Subject Of The Contract. The Contractors Connection Will Be To Report To Connect The Installations Together With The Required Attachments To The Local Distribution Network Operator (Osa). As Part Of The Contract, The Contractor Will Conduct Training Installation Users And Indicated Employees Of The Ordering Party In Terms Of Their Operation And Will Provide Warranty Service During The Warranty Period. 5. The Scope Of The Order For Parts 1 And Parts 2 Includes In Particular: 1) Designing A Photovoltaic Installation Together With All Necessary Components And Inclusion In The Building Installation, Including Assembly And Checking The Load Capacity Of The Structure; 2) Providing Equipment And Building Materials To The Area Of Construction Works, Necessary For The Implementation Of Photovoltaic Installation; 3) Implementation Of A Complete Photovoltaic Power Plant Covering The Work Automatically Photovoltaic, Inverter (I), Necessary Electrical Installation And Security; 4) Filling The Holes And Reproduction And Repair Of Some Damaged Expeditions (Finishing Elements) During Construction Works; 5) Conducting The Entire Installation And The Necessary Measurements; 6) Programming And Starting The Control System; 7) Starting The Photovoltaic Installation; 8) Photovoltaic; 9) Attachment On A Building Equipped With An Installation Of A Plastic Information Plate Developed In Accordance With The Guidelines Of The Management Institution Fe Sl 2021-2027 For Beneficiaries In The Field Of Information And Promotion; 10) Providing Users With The User Manual In Polish And Informing Them About The Principles Of Safe Use Of Photovoltaic Installation; 11) Preparation And Making The Correct Application Of Micro-Installation The Right Osd. 6. The Contractor Is Obliged To Develop
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.