Tenders Are Invited For Expansion Of Poviat Road No. 1 164 Wierzchowina - Bór - Cavity Consisting In Its Reconstruction From Km 1+859.00 To Km 1+977.45 Together With The Construction Of The Bridge Through Potok Jamnica At 1+900.00 In Km 1+900.00 In The M.
Tenders Are Invited For Expansion Of Poviat Road No. 1 164 Wierzchowina - Bór - Cavity Consisting In Its Reconstruction From Km 1+859.00 To Km 1+977.45 Together With The Construction Of The Bridge Through Potok Jamnica At 1+900.00 In Km 1+900.00 In The M.
The Order Includes: A) Designation Of A Temporary Detour In Accordance With The Project Of Temporary Traffic Organization, B) Making Tight Walls Of The Existing Embankments; C) Disassembly Of The Existing Bridge: Equipment, Wooden Surfaces, Steel B-6 Girders And Steel Supports As Well As Piles And Reinforced Concrete Tiles Of The Object; D) Disassembly Of The Existing Surface And Roadsides In The Scope Of Planned Reconstruction Of The Road, Which Is Traveling To The Bridge; E) Making New Bridgecar Bridges, Including: Reinforced Concrete Drilling Piles Φ 80Cm (Two Rows Of Two Rows For Foundations), Foundations And Bodies Mounted In Piles, Bituminous Insulation Of Concrete From The Earth And Steel Bearings; F) Performing The Load -Bearing System Span, Including: Transport Of Structures From Steel Girders, Anti -Corrosion Protection, Merging And Assembly On The Bearings, As Well As The Execution Of A Reinforced Concrete Combined Platform; G) Making The Surface And Equipment Of The Object, Including: Welding Insulation Of The Platform Plate, Bituminous Surfaces, Stone Curbs, Reinforced Concrete Kap And Resin Surfaces Of Pavements, Assembly Of The Bridge Barrier, Prefabricated Cornices And Dehydration Lumps, Making Transitions; H) Works On Commuting, Including: Making Backfilling Within The Excavations, Resistance Walls From The Reinforced Land, Road Surface For Loading The Kr3 Category, Inclusion Of Access To The Existing Poviat Road And To The Intersection With A Municipal Road; I) Assembly Of A Permanent Traffic Organization Marking; Technical Parameters Of The New Bridge: 1-Span-Concrete Beam Structure; Heb 1000 Sheet Metal Beams - 6 Pcs In 2.04 M Spacing; Total Length Of The Bridge - 30.20 M; Total Width - 11.90 M; Road Width - 23.25 M = 6.50 M; Width Of Pedestrian Pavements - 22.20 M; Load - Class Ii, According To Min. Infrastr. Of 29.08.2019; 2. The Detailed Scope Of Works Is Specified In Chapter Iii Of This Swz - In Accordance With The Offer Cost Estimate - Annex 1 And A Pre -Works Of Works - Annex 2. The Works That Are The Subject Of The Contract Must Be Carried Out In Accordance With The Executive Project - Annex 3 And With Technical Specifications Of The Implementation And Acceptance Of Construction Works - Annex 4 Of Chapter Iii. The Employer Requires A Guarantee And Warranty For Performed Works For A Period In The Range Of 36 - 60 Months; 3. The Contractor Is Responsible For Proper Protection Of The Works Area And Is Responsible For Any Damage Caused To The Employer And Third Parties. The Contractor Is Obliged To Organize The Area After The Works Are Completed; 4. The Subject Of The Contract Is Further Called The Specification Of The Terms Of The Contract Subject Of The Contract;
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.