Tenders Are Invited For Replacement Of The Central Heating And Domestic Hot Water Boilers With A Closed Combustion Chamber With 24Kw Condensing Boilers In Multi -Family Residential Buildings Owned By Zgm Tbs In Częstochowa Sp.Z O.O.
Tenders Are Invited For Replacement Of The Central Heating And Domestic Hot Water Boilers With A Closed Combustion Chamber With 24Kw Condensing Boilers In Multi -Family Residential Buildings Owned By Zgm Tbs In Częstochowa Sp.Z O.O.
1. The Subject Of The Order Is The Replacement Of 27 Pcs. And Hot Water With A Closed Combustion Chamber For 24 Kw Condensing Boilers In Multi -Family Residential Buildings Owned By The Housing Gospodarial Plant Towarzystwo Budownictwa Społecznego In Częstochowa Spółka Z O.O. Ul. Polish Military Organization 24, 42-200 Częstochowa. The Works Will Be Carried Out On The Basis Of Orders Issued By The Contracting Authority. 2. As Part Of The Implementation Of The Subject Of The Contract, All Actions Described In The Pre -City Of Works Constituting Annex 7 To The Specification Of The Terms Of The Contract And In The Technical Specification Of Construction And Acceptance Of Construction Works Constituting Annex 8 To The Specification Of The Terms Of The Contract Aimed At The Correct Performance Of The Subject Of The Contract, Including Make A Chimney Sweep Opinion In The Scope Of Connecting The Boiler To The Existing Chimney Channel And Make A Periodic Review Of The Boiler Between 9 (Nine) And 12 (Twelve) Month Of Its Operation, In Order To Ensure A Minimum 24 (Twenty -Four) Monthly Warranty. The Contractor In The Price Of The Offer Must Take Into Account All The Costs Necessary For The Performance Of The Order, Resulting Directly From Swz, As Well As Not Included In It, And Without Which The Order Cannot Be Executed. 3. Acting In Accordance With Art. 95 Para. 1 And 2 Point 1 Of The Public Procurement Law, The Contracting Authority Requires Employment By The Contractor Or Subcontractors On The Basis Of The Employment Relationship Of Persons Performing The Following Activities In The Scope Of The Contract, If The Performance Of These Activities Consists In Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code, Including: 1) The Ordering Party Requires That All Persons Carrying Out The Subject Of The Contract, Which Will Perform Actual Activities, I.E. Construction Worker - Profession Code 71, According To The Classification, The Specialty Specified In The Regulation Of The Minister Of Labor And Social Policy Of 7 August2014 On The Classification Of Professions And Specialties For The Needs Of The Labor Market And The Scope Of Its Application (Journal Of Laws Of 2018 (Journal Of Laws Of 2018 Item In The Event Of Termination Of Employment Before The End Of This Period, He Undertakes To Immediately Employ Another Person. The Obligation Referred To In The Previous Sentence Will Not Exist In The Event Of Termination Of The Employment Relationship Before The End Of This Period And Applies To The Person Whose Role In The Execution Of The Order Has Been Completed, 3) In The Template Of The Contract Constituting Annex 6 To Swz, The Method Of Verification Of The Employment Of The Person Referred To In Point Iv.3.1) Swz, B) The Contracting Authority In The Scope Of Control Of The Contractor Referred To In The Point Iv.3.1) Swz, C) Sanctions For Failure To Meet The Requirements Specified In Point Iv.3.1) And Point Iv.3.3).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.