1. The Subject Of The Contract Is The Renovation Of Rooms In The Buildings Of The Public Primary School Zośka Battalion In Celestynów At Ul. Wrzosowa 42 And Ul. Saint. Kazimierza 5. 2. As Part Of The Renovation Of Rooms In The School Building At Ul. Wrzosowa 42 In Celestynów, The Contractor Will Be Obliged To Perform: 1) Maintenance Work In Classrooms No. 31, 32, 33, 38, I.E.: Pvc Roll Floors Gr. 2Mm Object Type (With Ancestor) F) Welding Of Carpets G) Installation Of Pcv2 Skirting Boards) Maintenance And Renovation Work In The Teaching Room, I.E. ::A), Dismantling Of Existing Floors From Pvc Floor Coverings B) Grinding Concrete Floors C) Grounding Of The Substrate Under The Self -Leveling Masses D) Self -Leveling Floor. About 2.0Mm Terplan-N E) Installation Of Pvc Roll Floors Gr. 2Mm Object Type (With Ancestor) F) Welding Of Carpets G) Installation Of Pcwh Skirting Boards) Replacement Of Sockets, Contacts, Ventilation Grilles3) Maintenance Work In The Social Room, I.E.::), Dismantling Of Existing Floors From Pvc Floor Coverings B) Sanding Concrete Flooring C) Soil Grounding Under The Mass Self-Leveling D) Self-Leveling Flooring About 2.0 Mm, E.G. Terplan-N E) Installation Of Pvc Roll Floors 2 Mm Object Type (With Atest Of The Fire Protection) F) Welding Of Carpets G) Installation Of Pcv4 Skirting Boards) Maintenance Work At The Secretarys Office And Directors Office, I.E. ::-), Dismantling Of Wooden Skirting Boards B) Delustion Of The Surface E) Priming The Floor With Soil Selected For The Varnish Used F) Floor Painting Three Times (Varnish With A Fire Certificate With Increased Abrasion Resistance Intended For Public Utilities) G) Cleaning - Handwideling Manual Wall Plinths H) Priming, Varnishing Wall Plinth Two And) Maintenance In The Gym, I.E.::) Dismantling Of Wooden Skirting Boards B) Supplementing Cavities, Gaps In A Wooden Parquet C) Mechanical Grinding Of Floors Scraping A Wooden Parquet D) Dust Removal Of Surfaces E) Priming Floors With Soil Selected For The Used Varnish F) Varnishing Flooring Three Times (Varnish With A Firing. With Increased Abrasion Resistance Intended For Public Utilities) G) Cleaning - Manual Grinding Of Wall Plinths H) Priming, Painting Wall Plinths Twice And) Installation Of Skirting Boards J) Painting Lines On The Floor With Pu Paint To Line (Cleaning, Priming, Varnishing). 3. As Part Of The Renovation Of Rooms In The School Building At Ul. Saint. Kazimierz 55W Celestynowie The Contractor Will Be Obliged To Perform: 1) Maintenance Work In The Classroom No. 2, I.E.:) Dismantling Of Existing Floors From Pvc Floor Coverings B) Sanding Of Concrete Floors C) The Grounding Of The Substrate Under The Self-Leveling Masses D) Self-Leveling Flooring Of A Self-Leveling Floor Of About 2.0 Mm Of E.G. Terplan-N E) Floor Assembly Rulon Pvc Gr. 2 Mm Object Type (With Atest Of The Fire) F) Welding. Installation Of Pcwh Skirting Boards) Pcwh Plasters And) Cleaning The Wall With Steel Brushes J) Steel Brushes J) Plaster Wiping Wit
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.