4.1. The Subject Of The Contract Is The Implementation Of The Investment Task Entitled Thermomodernization Of The Osp Romartów Building, Witonia Commune, Through The Implementation Of Design Works And Construction Works. 4.2. The Task Is To Replace Heat Sources And Thermo-Modernization Works, As Well As Renovation Works, Which Is Primarily To: Conducting The Necessary Formal And Legal Procedures And Obtaining Required Consents, Permits, Decisions Or Administrative Decisions Purchase Of Necessary Materials And The Implementation Of The Implementation Of Necessary Construction And Installation Works Launching Built-Up Equipment And The Implementation Of Documents Completed And Completed As -Built Making Necessary Training For Service 4.3. The Subject Of The Contract Consists Of, In Particular: 4.3.1. Implementation Of Project Documentation - The Contractor Will Develop A Construction Project In Accordance With The Regulation Of The Minister Of Development Of September 11, 2020 On The Detailed Scope And Form Of The Construction Project (Journal Of Laws Of 2020, Item 1609) And The Regulation Of The Minister Of Development And Technology Of 20 December 2021 On The Detailed Scope And Form Of Project Documentation, Technical Specification And Acceptance Of Construction Works As Well Functional And Utility (Journal Of Laws Of 2021, Item 2454). Before Starting Design, The Contractor Will Obtain Conditions For Connecting To The Gas Network. 1) Before Starting Design Work, The Contractor Will Obtain And Verify The Data And Materials Necessary To Carry Out The Subject Of The Contract, As Well As Information And Documents Necessary To Design Construction Works Being The Subject Of The Contract. The Contractor, If Necessary, Ensures Authors Supervision Throughout The Duration Of The Investment Implemented On The Basis Of The Documentation Prepared. 2) The Duties Of The Employer Include The Receipt And Approval Of The Documentation, If It Is: - Made In Accordance With All The Requirements Of The Construction Law, - Has The Necessary Arrangements, - The Scope Of Work Is In Accordance With Pfu And Energy Audit. 3) The Contractors Duties Will Include The Development Of All Necessary Related Documentation, Including Industry Projects, Reports, Etc. The Approval Of All Documents By The Ordering Party Is A Prerequisite For The Implementation Of The Investment Task, From The Contract, But Does Not Limit The Liability Of The Contractor Resulting From The Contracting Authority Allowing The Use At The Stage Of Replacement Of Replacement Technologies At The Stage Of Design, But With Parameters Not Worse Than Presented In This Program. 4) Documentation Must Also: Include Optimal Technological, Construction, Material And Cost Solutions As Well As All Necessary Material Combinations, Details And Details Drawings With A Detailed Description And Administration Of All Necessary Parameters Allowing For Identification Of Material, Device, Be Made In Polish, In Accorda
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.