1) Reconstruction And Expansion Of The Utility Room Into A Thermal Junction Room. The Use Of The Room Includes: A) Execution Of Demolition Works; B) Execution Of Foundation Benches For Designed External Walls; C) Making Two Outer Walls In Existing Walls; D) Construction And Roof Covering; E) Execution Of Floor Layers On The Ground; F) Wall And Floor Finish (Execution Of Plasters, Putty And Painted With Epoxy Paint White); H) Execution Of The Electrical Installation; I) Implementation Of The Water And Sewage Installation, Ventilation, Heating. Control And Measuring And Automation; C) Assembly, Connection Of The Node With Internal Acceptance Installations; D) Starting The Node; E) Delivery And Assembly Of Hot Water Tank. 3) Central Heating Installation In The Scope Of: A) Installation Of Steel Plate And Bathroom Heaters With Valves And Thermo-Pative Heads; From Galvanized Steel Pipes; C) Assembly Of Adjustment Valves, Cutting Down; D) Mounting Heat Meters. Circulation.6) Performing All Measurements And Preparation Of Reports Of Tests And Electrical Installations. Works. The Performance Requires The Contractor To Grant A Minimum Guarantee For Completed Robots In The Amount Of 36 Months.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.