Tenders Are Invited For Implementation Of Design And Cost Documentation For The Renovation Of Building No. 2 In The Scope Of The First Floor With A Change In The Use Of The Use Of Use
Tenders Are Invited For Implementation Of Design And Cost Documentation For The Renovation Of Building No. 2 In The Scope Of The First Floor With A Change In The Use Of The Use Of Use
1. The Subject Of The Contract Is The Service Consisting In The Implementation Of The Project And Scoop Documentation For The Renovation Of Building Number 2 In The Scope Of The First Floor Along With The Change In The Way Of Use. 2. A Detailed Description Of The Subject Of The Contract Is Included In Annex 8 To Swz.3. Determination Of The Subject Of The Contract In A Common Dictionary Of Orders (Cpv): Scope Of Works To Be Carried Out In The Current Tender: Execution Of Project Documentation: • Inventory Of The Existing State To The Extent Necessary To Develop The Project (Drawing And Descriptive Part); • Implementation Of The Initial Project Of The Concept And Prior Reconstruction With The Ordering Party; • Implementation Of The Map For Design Purposes As Much As Required; • Public; • Execution Of A Preliminary Project In Accordance With The Decision To Determine The Location Of The Public Purpose And Prior Agreeing With The Employer Before The Completion Of Design Works, Which After Consultation Will Be Confirmed By The Acceptance Of The Writing By The Employer; • Agreement And Obtaining A Decision From The Provincial Office For The Protection Of Monuments; • Execution Of The Land Development Project, Architectural And Building Design, And The Technical Project To The Extent Specified In The Ordinances And Other Provisions Specifying The Scope And Form Of A Construction Project • Execution Of An Executive Project Divided Into Industries In Accordance With The Provisions Contained In The Ordinances And Other Provisions Specifying The Scope And Form Of A Construction Project • Preparation Of An Investor Cost Estimate Together With A Pre -Works Of Works To The Scope Covered By The Project • Preparation Of Technical Specifications For The Implementation And Acceptance Of Construction Works For The Scope Of Works Covered By The Abovementioned Design Documentation • Making Bioz Information • Obtaining The Necessary Arrangements And Checks Arising From Legal Provisions Together With Obtaining The Necessary Opinions: Sanitary, Health And Safety, Fire Protection And Other Documents Required By Special Provisions • Obtaining A Building Permit Or A Decision That The Administrative Authority Does Not Object To The Execution Of Works, If The Submission Of Construction Works Or Building Permit Is Required, The Contracting Authority Will Enable The Contractor To Carry Out A Local Vision Of The Building Before Submitting The Offer. The Design Provision Must Include A Land Use Project, Architectural And Construction, Technical And Executive For Design Purposes) Of All Industries, Including: • Architecture; • Construction With Technical Expertise; • Technology; • Sanitary Installations - Internal Installations: - Central Heating - Mechanical Ventilation If It Is Provided In The Building - Cold Water, Hot Water And Circulation • Electrical And Teletechnical Installations - Power Supply With Electricity 230V ~/400V ~ - Main Switchboards 0.4Kv - Double -Story Resol
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.