1. The Subject Of The Contract Is The Implementation Of Project Documentation, Obtaining The Decisions And Permits Required By The Right To Modernize The Spa Infrastructure Of The Gołdap Spa. As Part Of The Task, The Designer Will Be Obliged To Design And Value Construction Works And Services In The Field Of: A) Expansion Of The Graduation Tower With A Staircase From The South, Equipped With An Elevator To Adapt A Graduation Tower For People With Special Needs, Including For Disabled People In Accordance With The Assumptions Resulting From The Act On Availability As Well As To Ensure Access To All Scenes. With Beams Supporting It, Renovation Of The Power Platform Platform Of The Graduation Tower Together With The Connector (Replacement Of Degraded Platform Elements And Irrigating Bodies And Forming Formwork), Replacement/ Renovation Of Degraded And Corroded Connecting Elements: Main Structure Connectors, Steel Yoke, Anchors Together With Assembly Of Additional Strengthening Elements, Replacement Of Damaged Balustraes, Replacement Handrails, Formwork Of Wall Seats, And Stairs, Complement The Concrete Buck Of Walls And A Swimming Pool Plate, Cleaning The Surface Of The Concrete Along With Protection With Protective Coatings, Impregnation Of The Wooden Structure And Painting Of Wooden Elements, Cleaning And Anti -Corrosion Protection Of Steel Elements, Renovation Of The Lightning Protection System (Corroded Elements). Economic Necessary To Operate The Pump Room And Spa Park. Rehabilitation, I.E. Seats With Massage Function, A Multimedia Screen/ Projector Used For Occupational Therapies And Retrofitting Spa Devices With Additional Elements Of Small Architecture, Info Kiosk/ Multimedia Totem Adapted To People With Special Needs. Special Needs, Creating A Movement Path Equipped With Elements For Exercise, Aimed At Supporting Physical Activity And Rehabilitation, Adapting Existing Communication Routes To People With Special Needs By Eliminating Architectural Barriers, Adaptation Of Communication Routes And Developing Green Areas In A Way Determining An Additional Zone For Aromatherapy. In The Scope Of Electrical Installations, The Contractor Undertakes To Design The Replacement Of Lighting With Energy -Saving, Modernization And Expansion Of Monitoring Systems, Assembly Of Photovoltaic Installation For The Needs Of Spa Treatment, Modernization Of Tower Lighting, Including Dynamic Lighting. A Detailed Description Of The Subject Of The Contract Is Included In Chapter Vi Swz
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.