The Subject Of The Order Are Road Works Involving The Gravel Of Road Surfaces And Internal Roads Along With The Necessary Installation And Equalization Of The Road: A. Natural (30%) With A Fraction Of 0 - 31.5 Mm In The Amount Of About 4100 Tonb. Natural (50%) With A Fraction Of 0 - 31.55 Mm In The Amount Of About 1,000 Tonnes Of The Novinka Commune In 2025. Total Order Number - Approx. 5,100 Tons. Choosing A Type Will Depend On The Contracting Authority During The Works. The Contracting Authority Reserves That The Elections May Apply In Whole Or In A Significant Part Of One Of The Type Of Common. The Reduction In The Amount Of The Subject Of The Contract Does Not Cause Any Legal And Financial Consequences For The Contracting Authority And Does Not Require Amended. 2. Deliveries Will Be Successively Carried Out By Transporting The Contractor, On The Dates And Quantities That Confess To The Current Needs Of The Contracting Authority And To The Place Indicated By Him, Natenie Of The Novinka Commune. 3. The Contracting Authority Requires That The Supplied Material Comes From A Broken Aggregate With A Grain Of 0-31.5 Mm. Aggregate Should Be Homogeneous Without Foreign Pollutants And Clay Beggar. The Contracting Authority Requires That The Supplied Common Should Have Adequate Roads To Perform Road Embankments (It Was Cohesive And Easily Thickened), It Had A Delay To Compact Itself During Normal Road Use. Gravel Should Pay Gravel Requirements For Road Foundations, It Should Not Contain Stones That Would Cause A Gravel To Cause Danger Or Traffic Difficulties. 4. Natural Aggregate Used For A Gravel Mixture Should Meet The Requirements Of The Pn -B -11111 Mineral Aggregate - Natural Aggregates For Road Surfaces - Gravel And Mixture. 5. In The Case Of A Broken Aggregate With A Fraction Of 0-31.5 Mm, This Aggregate Should Meet The Pnen13242 Aggregate To Unrelated And Hydraulically Bound Materials Used For Construction And Road Construction. This Aggregate Will Apply To The Access Of The Foundation Of The Entire Width Of The Road And In Order To Fill The Defects In The Foundation Of Hard Hard Surface On The Roads Indicated By The Contracting Authority. 6. The Common Time Must Come From A Gravel Pit With A Conciliation License. 7. At Each Request Of The Contracting Authority, The Contractor Is Obliged To Submit The Contracting Authority Of Compliance And Material Type Examination. 8. The Contractor Bears Full Responsibility For The Quality Of The Aggregate Supplied Throughout The Perception Of The Order. 9. The Transport Of Aggregate Should Take Place In Self -Component Cars, In A Way That Affects The Pollution Of The Roads On Which It Will Be Transported. 10. The Contractor Is Obliged To Perform The Contract In Accordance With The Requirements Of The Provisions On Ruchudrog. In The Event Of Damage By The Contractor Of The Roads, Which Will Be Transported, The Contractor Is Obliged To Repair Them Immediately.11. Determining The Amount Of Aggregate Will Be Mad
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.