Engineering Works And Construction Works - 25E Bridge Construction Work. Remove The Upper Floor And Cover The Bearing Approx. 13,600 M³ Of The Top Floor Approx. 4,500 M³ Of Lawn Sowing (Including The Top Floor Bearing) Approx. 10,900 M² Asphalt Approx. 960 T Asphalt Cover Layer Ac 11 Dn Approx. 1,170 M² Asphalt Application Layer Ac 22 Tn Approx. 1,170 M² Asphalt Cover Layer Ac 11 Ds Approx. 270 M² Of Poll Protection Layer Approx. 300 M² Approx. 300 M² Frost Protection / Rolling / Gravel Dispose Of Approx. 2,600 T Of Frost Protection Approx. 2,400 T Geotextil (Fleece) Herst. Approx. 4,300 M² Geotextil (Thunderstorm) From. Approx. 3,650 M² Tw - Line Pe 100 Rc 280 X 25.4 Incl. Knote Dots Approx. 570 M Tw - Line Pe 100 Rc 160 X 14.6 Incl. Knote Approx. 425 M Protective Tube / Penetration / Pipe Incentive Approx. 110 M Ew Pipe Dn 250 Pp Sn 16 Approx. 115 M Line Ditch From Ca. Betting 2,310 M³ And Showering Of Pipelines Approx. 970 M³ Of Construction Pit. Concrete Concrete Including The Formwork Approx. 1,050 M³ Of Concrete Steel Approx. 140 T Protective Steel. (Se Made Of Steel) Approx. 400 M Gutter Made Of Concrete Shape Stones Remove / Manufacture Approx. 110 M Borders Approx. 110 M
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.