Tenders Are Invited For Construction Work - Design And Execution Of Construction Works On The Section Gdynia Chylonia - Lębork Railway Line No. 202 As Part Of The Project Entitled: Plot On The Railway Line No. 202 On The Section Gdynia Chylonia - Słupsk - Phase Ii.
Tenders Are Invited For Construction Work - Design And Execution Of Construction Works On The Section Gdynia Chylonia - Lębork Railway Line No. 202 As Part Of The Project Entitled: Plot On The Railway Line No. 202 On The Section Gdynia Chylonia - Słupsk - Phase Ii.
Construction Work - Design And Execution Of Construction Works On The Section Gdynia Chylonia - Lębork Railway Line No. 202 As Part Of The Project Entitled: Plot On The Railway Line No. 202 On The Section Gdynia Chylonia - Słupsk - Phase Ii.. The Subject Of The Contract Is: Design And Execution Of Construction Works On The Section Gdynia Chylonia - Lębork Railway Line No. 202 As Part Of The Project Entitled: Works On The Railway Line No. 202 On The Section Gdynia Chylonia - Słupsk - Phase Ii. The Entire Subject Of The Contract Includes The Performance Of The Following Elements: The Basic Scope Of The Contract Includes: 1. Development Of Project Documentation, Including: A) Construction Project, B) Executive Projects With The Bill Of Quantities And Stwiors, C) Obtaining Water Permits, D) Obtaining A Decision On Environmental Impact Conditions, E) Obtaining A Decision On Determining The Location Of The Railway Line And/Or Decisions On Establishing Location. Public Purpose Investments, F) Obtaining A Building Permit And Other Necessary Administrative Decisions, G) Performance Of Necessary Estimates In Order To Pay Compensation For Purchased Real Estate (Land, Buildings), H) Developing As -Built Documentation, Including Geodetic As -Built Documentation, 2. Construction Works In The Fields: A) Expansion Of The Line To The Entire Section To The Two -Track System, B) Reconstruction Of The Tracks For The Purpose Adaptation Of Geometry For Passenger Trains At A Speed Of Up To 200 Km/H And Freight Trains At Speeds Up To 120 Km/H, C) Building New Railway Control Devices (Srk), D) Devices And Telecommunications Systems, E) Traction Network With Power Supply, F) Equipment And Electricity Systems Up To 1 Kv, G) Construction, Reconstruction Engineering, H) Cubature Platforms And Facilities, I) Construction Of New Passenger Stops, J) Crossings And Journeys, K) Liquidation Of The Intersections Of The Railway Line With Roads In The Level Of Rails, L) Geology And Geotechnics 3. The Implementation Of Works Consisting In The Construction Of Facilities For Environmental Protection. 4. As -Built Documentation, Including: A) Developing Technical Regulations, In Cooperation With The Employer, Based On The Ir -3 Instructions, After Completion Of Construction Works, In The Scope Of All Industries, B) Developing Geodetic As -Built Documentation: - Picket And Longitudinal Profile Of The Railway Line, - Passing And Recipient Protocols Situational And Sealed With A Geodetic As-Built Inventory, C) Conducting The Process Of Assessing The Compliance Of Subsystems And The Transfer Of Relevant Declarations And Certificates For Subsystems, D) Development Of Documentation By Assumption And Measurement Of The Railway Geodetic Geodetic Matrix And Special Railway Matrix, E) Developing New Schemes Of Movement Posts And Expedition Points. 5. Conducting The Process Of Assessing The Compliance Of Structural Subsystems In The Scope Covered By The Order At Each Stage (Design, Construction And Final Rehearsals Of The Subsystem) And Transferring Relevant Declarations Of Verification And Verification Certificates For Subsystems. The Interface Option Includes: The Implementation Of The Benefits Specified In Chapter 5 Of Volume Iii - Pfu Expected Changes In The Field
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.