The Municipality Has A Continuous Need For Counseling In Water And Wastewater Planning. This Includes, Among Other Things: • Preparation Of Main Plans And Pre-Project For Water Facilities • Detailed Planning Of Wiring, Pumping Stations And Associated Facilities • No -Ig Projects • Dimensioning And Calculations For Capacity Requirements On Both Drainage And Water • Design For Tenders Including The Preparation Of Necessary Drawings And Technical Descriptions • Follow -Up In Construction Phase And Quality Assurance Of Execution • Counseling In Connection With Regulatory Requirements And Permits • Evaluation And Optimization Of Existing Infrastructure • -Analysis On The Wiring Network (Water, Drain And Overwater). The Framework Agreement Shall Ensure That The Municipality Has Access To Counseling Services If Necessary, Through Calls Based On The Scope And Complexity Of The Projects.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.