Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
21-04-2025
Work Detail
Quotation are invited for Supply & Installation of the Lock off Key Assembly Unit Replacement the Co2 Lock 1032406289 1 ITEM-00001 SUPPLY & INSTALLATION OF THE LOCK OFF KEY ASSEMBLY UNIT1.#SUPPLY OF THE CO2 LOCK OFF KEY WITH RELAY SWITCH AND DOOR LOCKCYLINDER ASS EMBLY OF RIGID STAINLESS-STEEL MATERIAL FOR THE GAS TURBINECO2 PROTECTED DOORS AS PER THE APPLICABLE STANDARDS.2.#INSTALLATION OF CO 2 LOCK OFF KEY ASSEMBLY IN STATUS INDICATOR ANDDOOR LOCK ASSEMBLY IN RESPECTIVE CO2 PROTECTED DOOR3.#FUNCTIONALITY TESTING OF CO2 LO CK OFF SYSTEM IN THE EXTINGUISHINGCONTROL PANEL OF THE RESPECTIVE AREA FOR VERIFICATION PROPERFUNCTIONALITY OF LOCK OFF MODE AND SAF E TO ENTER MODE IN THE STATUSINDICATOR4.#THE CONTRACTOR IS RESPONSIBLE TO ENSURE SMOOTH AND PROPER OPERATIONOF THE CO2 PROTECTED DOO RS WITH THE NEW CYLINDERS WITHOUT ANY MECHANICALJAM.5.#THE LOCK OFF KEY SYSTEM SHALL BE SELECTED FROM THE 18 EA REPUTEDMANUFACTURER AND SU ITABLE TO THE ENVIRONMENT CONDITION. EACH LOCK SHOULDBE PROVIDED ALONG WITH 5 SET OF STAINLESS-STEEL KEYS.6.#KKS, NAME PLATES WHERE APPLICABLE SHALL BE PROVIDED IN NON-CORROSIVESTAINLESS-STEEL PLATES AS PER THE DEWA REQUIREMENT (IF APPLICABLE).7.#THE BIDDER SHALL PROVIDE TENTATIVE DATE FOR MATERIAL DELIVERY,COMMENCEMENT AND COMPLETION OF THE ABOVE IDENTIFIED ACTIVITIES.8.#THE COMPLETE HANDLING OF THE MATERIALS INCLUDING TRANSPORT FROM SHOPTO SITE, LOADING AND UNLOADING, STORING AT SITE TILL THE INSTALLATIONSHALL BE DONE BY THE CONTRACTOR AT HIS COST AND RESPONSIBILITY.9.#THE SCAFFOLDING (WHEREVER REQUIRED) SHALL BE PROVIDED AND INSTALLEDBY CONTRACTOR. IT IS THE CONTRACTOR#S SOLE RESPONSIBILITY TO ENSURE THATNO DISTURBANCE INTERFERENCE, OR INTERRUPTION TO BE CAUSED ON NORMALPLANT O PERATION. ANY DAMAGE TO THE EQUIPMENT DURING THE EXECUTION WORKSHALL BE RESTORED IMMEDIATELY BY THE CONTRACTOR WITH THE SAME MATERIA L.10.#ANY REPLACED PARTS/SCRAP, WHICH IS NOT REQUIRED BY DEWA SHALL BEREMOVED FROM SITE. THE DISPOSAL IS THE CONTRACTOR RESPONSIBILI TY. THEOTHER MATERIALS, SCRAPS OF THE REPLACED EQUIPMENT, WHICH DEWA REQUIRESARE TO BE TRANSFERRED TO THE ASSIGNED STATION LOCATION BY THECONTRACTOR. ANY PLACE, WHERE OLD EQUIPMENT HAD BEEN REMOVED, MUST BECLEANED FOR GOOD HOUSEKEEPING.11.#USAGE OF THE PROPER TOOL S AND EQUIPMENTS ARE REQUIRED FOR THEINSTALLATION OF THE FIELD EQUIPMENT Replacement the Co2 Lock STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332500942)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.