1. The Subject Of The Contract Is The Implementation Of The Task Entitled: Construction Of An Open Retention Reservoir In The Rajgród Commune In The Design And Build System. 2. The Performance Of The Subject Of The Contract Includes, Among Others, Among Others 1) Designing And Implementation Of Construction Works Related To The Construction Of A Retention Reservoir Measuring About 162X27.5M, An Area Of About 4,455M2, A Depth Up To 2.99M And A Slope Of The Slopes 1: 1.5, In The Rajgród Commune In Danowo, On The Plot No. 59,2). The Investment Of Existing Trees And Spreading The Surplus Of Soil Formed From The Tank Excavation. 3. As Part Of The Implementation Of The Task, The Contractor Will Perform And Develop And Develop: 1) Map For Design Purposes Of The Paper Version And The Ed. In Electronic Version, 2) A Map Of Land Records And Simplified Excerpts From The Land Register For Plots Of Land On Which The Investment Will Be Implemented - 1 Copies, 5) Complete Materials Necessary To Obtain A Decision On The Environmental Conditions Of The Project - 6 Copies, 6) Decision On The Environmental Conditions Of The Project - 1 Copies (If Concerned), 7) Water -Legal Report - 3 Copies (If Concerned), 8) A Final Decision Of The Water Permit - 1 Copies (If Concerned), 9) Complete Construction Project - 5 Copies, Containing: - Land Development Project - Architectural And Construction Design - Technical Design 10) Agreements Required By Law, Opinions And Administrative Decisions, 12) Will Develop As -Built Documentation With Geodetic Inventory, Combining With Protocols, Approval Certificates, Approvals, Information On The Guarantee Granted. Construction, 18) As -Built Documentation 3. All Formalities Related To Obtaining A Permit For Felling Trees Within The Subject Of The Contract, Are On The Part Of The Ordering Party, 4. Due To The Nature Of Remuneration (Lump Sum) And The Implementation Of The Order In The System Design And Build, The Bills Of Works Perform Only Information Function. 5. In Detail The Scope Of The Subject Of The Contract And The Conditions Of Implementation Are Specified In The Functional And Utility Program Constituting Annex 9 To Swz And The Draft Contract-Annex 4 To Swz, Which Is An Integral Part Of This Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.