The Subject Of The Order Is Construction Works Involving The Investment Task Entitled ,, Replacement Of The Decking Of The Upper Part Of The Peak Walls And Impregnation Of All Roof Slopes Of A Wooden Granary In Skomlin. The Order Of The Contract Covers In Particular: 1) Developing Project Documentation In Accordance With The Functional And Utility Program-Hereinafter Pfu (Annex No. 1 To Swz) Containing: A) Construction Project Developed In Accordance With The Budgement Act, The Regulation Of The Minister Of Development Of September 11. 2020 In A Detailed Scope And Form Of The Construction Project, And In Accordance With The Regulation Of The Minister Of Development And Technology Of 20 December 2021 On The Detailed Scope And Form Of Project Documentation, Technical Specifications Of The Implementation And Receipt Of Construction Works As Well As A Functional And Utility Program-In Paper Form And In Electronic Form On Cd/Dvdb). Executive (Technical) Projects For The Entire Order Of Order) The Ordinance Of The Minister Of Development And Technology Of 20 December 2021 On The Detailed Scope And Form Of Project Document, Technical Specifications And Receipt Of Construction Works As Well As A Functional And Utility Program (Dz. U. Item 2454). - In Paper Form And In Electronic Form On The Cd/Dvd; C) Investors Cost Estimate Developed In Accordance With The Regulation Of The Minister Of Development And Technology Of 20 December 2021 On Determining The Methods And Grounds For Drawing Up An Investor Cost Estimate, Calculating The Scored Costs Of Design Work And Planned Costs Of Construction Works Specified In The Functional And Use Program- In The Form Of A Cd/Dvdd) Technical Specification And Acceptance Of Works In Accordance With The Regulation Of The Minister Of Development Of September 11, 2020 On The Detailed Scope And Form Of The Construction Project, And In Accordance With The Regulation Of The Minister Of Development And Technology Of 20 December 2021 On The Detailed Scope And Form Of Project Documentation, Specifications And Receipt Of Construction Works And Functional And Functional Work-In Paper In Electronic Form On The Cd/Dvd2) Obtaining The Rights Required By Law, Reviews, Arrangements And Checking Of The Project Documentation For The Planned Project; 3) Obtaining A Building Permit Or Notification Of Intention To Perform Construction Works (According To The Conditions Resulting From Construction Law), 4) Execution Of Renovation And Conservation Works Based On The Design Documentation. Annex No. 1 To Swz, Consisting In Particular In: Developing Project Documentation And The Implementation Of Renovation And Conservation Works Based On It, Consisting Of Impregnating The Wooden Roof Covering With Coniferous Shingles And Replacing The Damaged Craving From Boards In The Vertical System Of The Upper Part Of The Peak Walls (Top Of The Main Roof) In The High-Rise Building Of The Sparrow, 1777. The Wooden Granary Was Entered In The Register Of Immovabl
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.