1. The Subject Of The Order Is The Construction Of A Columbarium In The Cemetery On The Plot With Registration Number 962/12 Located Within The Registration Area 0010 Świdnica, In The Cadastral Unit 080907_2 Świdnica Together With Paths, In Accordance With The Design Documentation. The Investment Includes The Construction Of 5 Equal Columbari 1A , 1B , 1C , 1C , 1C , 1C , 1C 1D And 1E In The Form Of Fragmented Walls With Niches For Placing Urns With Ashes Of The Dead On Both Sides Of The Wall. Columbaria Should Be Made Of Prefabricated, Reinforced Concrete Niches Combined In Three Floors. The Surface Of The Columbariów Buildings Is To Be: 1) Columbarium 1A - 5.81 M2,2) Columbarium 1B - 5.81 M2,3) Columbarium 1C - 5.81 M2.4) Columbarium 1D - 5.81 M2.5) Columbarium 1E - 5.81 M2. Characteristic Parameters 1 Pcs. Columbarium: 1) The Width Of The Front Facade Is 1.22 M, 2) Length - 4.76 M, 3) Height - 2.19 M, 4) Cubature - 12.72 M3. The Conditions Of The Substrate Are Straight, Homogeneous, Unworthy And Bearing Substrate. The Geotechnical Layer Consists Of Fine -Grained And Medium -Grained Sands With An Admixture Of Gravel. Columbaria Should Be Founded On The Foundations. Paths Along The Columbarium Should Ensure Movement Of Disabled People. The Order Also Includes Elements Of Small Architecture. The Concise Description Of The Subject Of The Contract Was Described In Annex 8 To Swz - Design Documentation. Note: The Contracting Authority Makes, Modifying The Records Of The Document Called Technical Specifications Of The Execution And Acceptance Of Works, Which Is In Annex 8 To Swz - Project Documentation, Stwior Folder: A) The Contracting Authority Is Removed In Point 5.1. Stwior (Page 10); B) The Ordering Party Deletes Point 7 The Measure Of Works In Stwior (Page 12-13), The Procedure Is Required To Settle Flat-Rate; C) The Contracting Authority Deletes Point 8 Receipt Of Works In Stwior (Page 13-14) And Other Provisions Regarding The Receipt Of Works Included In Stwior. The Guidelines In The Scope Of Acceptance Of Works Were Specified In The Contract Template Constituting Annex 7 To Swz. Note: The Attached Works Of Works Are Used Only As An Auxiliary Element, It Should Not Be The Basis For The Valuation Of Works. Acceptance, Settlements And Payments For The Performance Of The Subject Of The Contract Will Take Place On The Terms Set Out In The Contract. The Lack Of The Provisional Lack Of Works Necessary To Be Carried Out On The Basis Of Project Documentation Does Not Release The Contractor From The Obligation To Perform Them As Part Of The Contractual Remuneration. In The Event Of A Discrepancy Between Design Documentation And Technical Specification Of Construction And Acceptance Of Construction Works, And A Pre -Works Of Works, The Scope Of Works And Their Quantity Resulting From The Design Documentation And The Technical Specification Of The Implementation And Acceptance Of Construction Works Should Be Adopted. In The Event That The Design Documen
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.