1. The Subject Of The Contract Is The Comprehensive Supply Of Gas Fuel- Natural Gas Of The High-Momethane Group E (Hereinafter Referred To As Gas Fuel), Including Sales And Distribution To The Police Units Of The Lower Silesian Garrison In An Estimated Amount Of 475 600 Kwh, According To The List Of Conscription Points. The Contractor Is Obliged To Provide Gas Fuels With Warm Combination And The Quality Parameters Specified In The Tariff Regulations. The Gas Fuel Distribution Service For Installations Located In The Reception Points, Described In Detail In Annex 1 To The Designed Provisions Of The Contract (Ppu), Will Be Performed By The Distribution System Operator. All Technical Conditions For Supplying Gas Fuel For A Given Delivery Point Are In Line With The Provisions Of Iriesp And/Or Iriesd Of The Relevant Operator And Specified By Him. Gas Supplies Will Take Place Via The Distribution Network Belonging To The Distribution System Operator (Osd). A Possible Change In The Forecast Consumption Will Not Result In Additional Costs For The Employer (Recipient) Except For The Settlement For Actually Used Gas Fuel According To The Prices Set Out In The Contract And Settlement For The Distribution Services Of The Collected Gas Fuel, According To The Operators Tariff To The Network In Force In A Given Period, Which The Contracting Authority (Recipient) Is Connected. The Suspension Or Limiting The Supply Of Gas Fuel To The Recipient, In A Situation Where Immediate Suspension Or Limiting The Supply Of This Fuel Could Cause A Threat To Safety, Life, Health Or Environment, Or Damage Or Destruction Of The Recipients Technological Objects, Will Be Possible Within 7 Days At The Latest 7 Days Of Taking Authorized Actions. 2. The Applicants Have Not Divided The Subject Of The Order Into Parts And Does Not Allow Partial Offers. The Submitted Offer Must Include All Seven Tasks: Conscription Points: A) Task 1 Comprehensive Delivery And Distribution Of Natural Gas E -Group E To The Collection Point - 51-609 Wrocław, Ul. Szymanowskiego 11, Bw-5 Tariff, Conscription Point Number 8018590365500019305009, Forecast Consumption For 12 Months 130,000 Kwh, B) Task 2 Comprehensive Delivery And Distribution Of Natural Gas High-Monitored Group E To The Collection Point-55-095 Długołęka, Ul. Wrocławska 24, Bw-3 Tariff, Noctoral Point Point 8018590365500038885179, Forecast Consumption For 12 Months 85,000 Kwh, C) Task 3 Comprehensive Delivery And Distribution Of Natural Gas High-Monitored Group E To The Collection Point-58-250 Pieszyce, Ul. Kościuszki 18, Bw-3 Tariff Group, Conscription Point Number 8018590365500035130821, Forecast Consumption For 12 Months 35,000 Kwh, D) Task 4 Comprehensive Delivery And Distribution Of Natural Gas High-Melted Group E To The Collection Point-55-040 Kobieczyce, Ul. Witosa 11, Bw-3 Tariff, Noctoral Point Point 8018590365500035143517, Forecast Consumption For 12 Months 55,000 Kwh, E) Task 5 Comprehensive Delivery And Distribution Of Natural Gas H
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.