A Hot -Water Heating System With Forced Water Circulation Is Designed For The Supply Of Heated Areas By Heat. The Heating System Will Be In The Temperature Gradient Of 80/60 ° C. Gas Condensing Boilers Are Designed As A Heat Source, Which Are Located In The Existing Boiler Room. Hot -Water Condensing Boilers With 2X 300 Kw Are Designed For Heating Water Heating. From The Boiler Units, The Heating Water Is Led Through A Hydraulic Pressure Balancing Bailler Into A Combined Heating Water Distributor. The Heating Water Is Led Through The Pump Assemblies Directly Into The Heating System. In More Detail In The Heat Source Diagram. The Pipes From The Associated Heating Water Distributor Will Be Connected To The Existing Heating Wiring On The Boundary Of The Boiler Room And The Technological Part Of The Pool Operation. The Gas Boilers Are Used To Heat The Heating Water, Then The Heating Water Is Heated By Pool Water, Hot Water And A Help. The Existing Chimney Body Will Be Used To Remove The Flue Gas From The Boiler Units. Before Connecting The Boiler Units, It Is Necessary To Revise The Chimney Body. Condensate From Gas Boilers Will Be Drained By Ppr Pipes Into The Neutralization Vessel And Then To The Existing Sewer. The Existing Boiler Room Ventilation Will Be Left In The Space With Gas Appliances. Air For Burning Natural Gas In A Gas Appliance Will Be Maintained Existing From Outdoor Space. According To Čsn En 070703 It Is A Boiler Room Ii. Category. The Boiler Room Will Be Equipped With Safety Features According To Valid Regulations And Decrees (Ie Gas Reinforcement Sensor, Carbon Monoxide And Emergency Conditions Of Boiler Room Technology). Regular Inspections And Tests According To Valid Standards Will Be Carried Out On The Equipment. The Gt Wiring Will Be Connected To The Existing Object Heating System In The Boiler Room. The Piping Wiring Will Be Slept So That The Pipe System Can Be Drained. Pipe System To Drop Into The Heating Water Distributor. Mount The Highest Heating System Points With An Automatic Vent Valve. The Heating System Security Device Consists Of A Safety Valve Located In Boiler Units. Furthermore, The Existing Expansion And Replenishment Equipment Of The Reflex, Including The Water Treatment Plant With The Reverse Backup, Is Maintained For Aligning The Heating Water Volume. The Safety Valve Settings Will Be Made To 3.0 Overpressure Bars. The Cascading Control Unit, Including The Required Number Of Modules, Will Be Fitted To Control Thermal Output And Control Of Boiler Units Operation. A Superior Control System Is Designed To Control Individual Heating Circuits. The Control System Is Solved In A Separate Part Of The Project Documentation. As Part Of The Modernization Of The Gas Boiler Room, The Regulation Of Pool Water And Whirlpool Heating Is Modernized. Modernization Means The Replacement Of Three -Way Valves And Circulation Pumps.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.