Installation Services Of Electrical And Mechanical Equipment - Secondary Renewal Uw Farnroda. As Part Of The Secondary Reconstruction Of The Farnroda Substation, The Client Plans To Replace The Secondary Technology Of The 110 Kv And 20 Kvan Layer Parts. In This Context, The Protective And Control Cabinets Of The 110 Kv System As Well As The Control Cabinets Of The Voltage Control And Star Point System Must Be Replaced Or Converted. In Addition, The Secondary Equipment Of The Low-Voltage Niches In The 20 Kv System Must Be Renewed. In This Context, The Doors Of The Low -Voltage Niches Must Be Delivered By The Contractor And Optionally Exchanged. The Secondary 110 Kv Reconstruction Includes 5 Fields Or 4 Protective And 5 Control Cabinets. The Secondary 20Kv Reconstruction Includes 14 Cells. A New Control Cabinet In Analogue Construction Is To Be Built To The Existing Cabinet For The 20 Kv Star Point. Incidentally, The Scope Of Services Results From The Cover Letter.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.