Corrigendum - Quotation Are Invited For Surface Preparation And Protective Coating Of Dfo Tank Internal Surface

Tender Detail

95303381
2412500578
Self-Funded
Corrigendum - Quotation Are Invited For Surface Preparation And Protective Coating Of Dfo Tank Internal Surface
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
16-04-2025

Work Detail

Quotation Are Invited For Surface Preparation And Protective Coating Of Dfo Tank Internal Surface Surface Preparation 1032501222 Surface Preparation And Protective Coating Of Dfo Tank Internal Surface,At M Station, Jebel Ali For Queries Contact Mr Anton Jacob M Obile: 0554607122 Anton.Jacob@Dewa.Gov.Ae 1 Item-00001 Surface Preparation And Protective Coating Of Dfo Tank Internal Surface,At M Station, Jebel Alitechnical Specification1.0#Scope Of W Ork (Qty 01 No. Dfo Tank)1.1#The Scope Includes Provision For Carrying Out The Painting Work,Site Preparation, Surface Preparation B Y Sandblasting (Iso 8501-1 Gradesa 3), Supply & Application Of Most Suitable Protective Coatings As Perexisting Coating System (Jotu N Tank Guard - Grey Color) On Internalsurfaces Of The Followings:1.1.1#Bottom And Annular Plate & 1M Height Of Shell1.1.2#All Column S And Pipe And Pipe Supports1.2#Supply Of Blasting Abrasives, Sealants, Cleaning Agents, Allapplicable Coating Materials, Applicatio N / Inspection Tools & Equipmentand All Required Consumables Including Tarpaulin And Green Mesh To Coverthe Area In Order To Protect The Environment From Spill/Splash Ofblasting Abrasives And Painting Materials1.3#Joint Inspection To Be Carried Out For Complete Bo Ttom And Annularplate Including All Columns And Pipe And Pipe Supports Etc. Followingthe Cleaning & Before Apply The Paint/Coatings To Ensure No Corrosiondamages Which Need To Repair / Replace By Dewa.1.4#Complete Removal Of The Existing Coating To Bare Metal By B Lastingcleaning (Iso 8501-1 Grade Sa 3).1.5#After Sandblasting, Dewa Will Carry Out Will Inspect The Surfacefor Any Defect And Recti Fication If Required Will Be Done Accordingly Bydewa.1.6#Manual Cleaning Using Hand And Power Tools Wherever Necessary Andat Non-Rea Chable Areas.1.7#Application Of Complete Coating In Compliance With Existing Coatingfor All Components Under This Scope.1.8#Stage Wi Se Coating Inspections And Quality Assurance At Completionof Each Activity. Surface Preparation And Paintings Shall Be Inspectedby E Iac Certified Third Party Inspector.1.9#Preparation Of Check Lists And Reports At The Beginning, During Andend Of Each Activity.1.10 #Handing Over Final Report With All Check Lists To Concerned Dewaengineer1.11#Safety Supervisor Shall Be Available At Site During En Tireprocess.1.12#Method Of Statement For Surface Preparation And Painting To Besubmitted In Advance.1.13#Inspection Test Plan To Be Submitted In Advance.1.14#Project Safety Plan And The Risk Assessment For Complete Job To Besubmitted In Advance.1.15#Technical Data Sheets Including Msds Of All Painting Materials Tobe Submitted In Advance.2.0#Physical Boundary And Volume Of The Contract:2.1#Bound Ary Of Work Is From All The Internal Surfaces Of Dfo Tankbottom Plate, Annular Plate, Shell (1 M Height Of Shell), And Columns,Pipe And Supports Up To 1M Height2.2#Volume Of Work Consists Of All The Internal Surfaces Of Dfo Tankbottom Plate, Annular Plate, Shell ( 1 M Height)2.3#Refer Attached Dfo Tank Drawing.3.0#Qualification Of Bidder3.1#As A Primary Requisite, Bidder#S Primary Business Shal L Bespecialized In Surface Preparation By Hydro Blasting And Coatingapplication Services, Inspection And Testing In Protective And M Arineand Heavy Commercial Industries With Consolidated Proven Experience Inor Outside Uae In Similar Environment.3.2#The Bidder Shall Have Specialists To Depute A Qualified Coatinginspector (Nace Coating Inspector Level-2 Certified Or Equivalent) Whoshall Conduct Inspections And Testing At Every Stage Of The Process Atdewa Premises And Release/Issue Required Clearance Certificates Ofacceptance /Clearance To Dewa.3.3#Bidder Shall Provide List Of Current And Completed (Site Based)Jobs From Latest To Oldest Within The Time Fra Me Of At Least Past 2Years. The List Must Contain Details Of Client Names, Completedescription Of Work Performed, Coating System Use D, Completion Date (Forcompleted Jobs), Complete Description Of Maintenance And Repair Workscarried Out During Warranty Period, Etc. Bids Not Meeting Thisrequirement Will Not Be Considered.3.4#Bidder Shall At All Times Comply With The Laws And Regulationsenforced In The Uae And In The Emirate Of Dubai In Particular The Bidderwill Be Required To Comply With All Site Safety Rules And Environment Alregulations.3.5#The Bidder Should Have At Least 5 Years Proven Experience Insimilar Types Of Jobs. Bidder Should Provide The Manpo Wer Structure Forthe Project Execution.3.6#Bidder Must Have A Written Policies On Quality, Health, Safety And Environment. 3.7#Bidder Should Provide Organizational Chart For The Projectexecution Showing Division Of Responsibility, List Of Names, Titles,Du Ties, And Job Descriptions For Key Personnel (Management, Technical,Quality Control, Safety). The Job Description Shall State Theexp Erience, Licenses Andcertifications For Each Position.3.8#The Project Manager Shall Be A Certified Nace Coating Inspectorlevel 3 Hol Der, With A Bachelor#S Degree In Engineering Obtained From Arecognized University In Relevant Field And Have At Least Five Years Ofe Xperience In The Project Management Of Similar Types Of Works.4.0#Pre-Bid Site Inspection4.1#The Interested Bidders Shall Visit The Site Prior To Submission Oftender/Bid. Submission Of Tender/Bid Shall Be Deemed To Have Consideredthe Site Conditions Taken Into Acc Ount After Necessary Site Visit.4.2#Visit To Site Can Be Arranged During Normal Working Hours I.E.,07:30 A.M. To 03:30 P.M. Between Sundays To Thursday, On Priorarrangement.4.3#The Contractor Shall Visit The Site And Make Himself Fully Familiarwith The Work Scope, Plant Access, Facilities, Complexities, Etc.,Before He Submit His Bid. Dewa Will Not Accept Any Claim For Extrasbeyond The Order Ra Tes / Prices During And After The Execution Of Workordered.5.0#Submission Of Bid:5.1#Quotation Shall Be Submitted To Carry Out The F Ull Scope Of Work Asmentioned In This Document5.2#The Bid Should Be On Lump Sum Basis With Break-Up For Each Activityshall Be Shown In The Bid6.0#Acceptance Of Bid:6.1#While Effecting The Order, Dewa Has The Following Right To Makeminor Changes In The Scope Of Job To Suit Local Authorities / Dewaquality Plan Requirements.7.0#Termination Of Contract:During The Contract, If The Performance Of Th E Contractor Or The Qualityof His Work Is Found Unsatisfactory, Dewa Has The Right To Terminate Thecontract.8.0#Facilities Provided By Dewathe Following Facilities Shall Be Provided By Dewa, Free Of Charge Tothe Contractor, Limited To The Scope Of Work Under This Contract:8.1#Scaffolding, Service Air, Electricity And Water For Work At Dewasite. It Is The Responsibility Of The Contractor To Hav E His Ownarrangement In Extending The Air, Electricity And Water Utility To Thework Locations. Service Air Filter/Moisture & Oil Sep Arator Arrangementsshall Be Arranged By Contractor, While Using The Air For Paintingactivities. If The Service Air Available At Dewa Site Is Found Notsufficient, Then Contractor Shall Arrange Portable Air Compressor Asrequired.8.2#The Contractor, However, Is Requi Red To Furnish His Requirement Ofpower And Water With Full Justification, Well In Advance. Contractorshall Not Claim Delay In Execut Ion Due To Short Time Notice For Suchrequirements. In Any Case, Contractor Shall Not Waste Or Misuse Anyfacilities Provided By Dewa. 8.3#Access And Fall Protection To Carry Out The Work Shall Be Providedby The Contractor. Any Safety Observations Found, Contractors Toimmediately Report To Concerned Dewa Engineer.8.4#The Dewa Engineers Or Managers Shall Be Contacted At Any Time Inoffice Hours For Any Queries And Doubts And In Case Of Emergencies Anytime Beyond Office Hours Even During Holidays And Off-Days.8.5#Necessary Ptw / Lc / Hwp From Operation, Chemical Lab / Firedepartment Clearances To Carry Out The Scope Of Work Under Thiscontract.8.6#Transportat Ion For Crew/Material Mobilization Crew And Movementfrom One Place To Other Within The Power Station Complex Shall Bearranged By Con Tractor At His Own Cost.9.0#Penalty For Delay In Completion Of The Work9.1##A Penalty Of 1.25% Of The Po Value Shall Be Imposed On T Hecontractor For Every Calendar Day Of Delay Beyond The Contracteddelivery, Subject To A Maximum Of 10% Of The Total Po Va 1 Ls Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2412500578)/$Value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail