1. The Subject Of The Contract Is The Implementation Of The Investment Entitled Termomodernization Sp. Treasures Of Lower Silesia In Malczyce And The Creation Of A Village Common Room In Rachów., As Part Of Co -Financing From The Polish Government Fund, Order: Strategic Investment Program. 2. The Subject Of The Contract Was Described In Detail In The Technical Documentation. 3. The Scope Of The Subject Of The Contract Includes, In Particular: 1) Execution Of Construction Works Based On Swz Documents, In Particular: Description Of The Subject Of The Contract, The Bill Of Quantities, Stwior Together With Benefits That Are Not Building Works, In Accordance With The Provisions Of The Construction Law In Force At The Time Of Their Implementation And Other Attachments, 2) Preparing As -Built Documentation, Including Changes And Corrections Introduced During The Works Construction; 3) Developing The Bioz Plan (If Required), 4) Making An Effective Notification Of Completion Of Construction Works, 5) Transfer Of The Completed Investment To The Ordering Party.Tap I: Thermomodernization Of The Sp. Treasures Of Lower Silesia In Malczyce Project And Executive In The Formula Design And Build Specific Pfu, And In Particular The Development Of Construction Documentation And Technical Reconstruction Of Two Individual Boiler Rooms For Solid Fuel For Gas Fuel -Powered Boiler Rooms, Which Will Operate In The Field Of Heating And Hot Utility Water Installation, Individual Buildings Of School Buildings. The Works Include The Boiler Room In The School Building And The Boiler Room In The Building Of The Sports Hall.Etap Ii: Creation Of A Village Common Room In Rachów By Completing The Implementation Of Works In The Field Of Construction (Ii Stage), In The Field Of Photovoltaic Installation, In The Scope Of Electrical Installation And In The Scope Of Sanitary Installations And Works Related To Land Development. Construction Robots Will Constitute A Continuation Of The Task. The Scope Of Works To Be Carried Out Was Determined On The Basis Of External Works For The Construction, Sanitary And Electrical Industries. 4. A Detailed Description Of The Manner Of Implementation Of The Subject Of The Contract (Including, Among Others, The Terms Of The Performance Of Works, Payment Terms, Terms Of Acceptance, Subcontractors) Were Specified In Swz, Functional And Functional Program And Other Technical Documentation, And In The Planned Provisions Of The Contract.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.