Tenders Are Invited For Engineering Services- City Of Bad Neuenahr-Ahrweiler: Planning Services For Inner-City Sewer And Road Construction Work, For Planning Package No. 11.1
Tenders Are Invited For Engineering Services- City Of Bad Neuenahr-Ahrweiler: Planning Services For Inner-City Sewer And Road Construction Work, For Planning Package No. 11.1
Engineering Services- City Of Bad Neuenahr-Ahrweiler: Planning Services For Inner-City Sewer And Road Construction Work, For Planning Package No. 11.1. The Subject Of This Tender Is The Planning Services For Planning Package No. 11.1 In Accordance With The Bad Neuenahr_Ahrweiler_Planung Packages. All Available Damage Has Already Been Examined By An Expert And Can Be Removed From The Tender Documents. The Present Damage Reports Are To Be Regarded As A Planning Basis. On This Basis, The Planning Services Of The Service Phases 1-9 In Accordance With § 47 Hoai Performance Profile Transport Facilities As Well As § 43 Hoai Services Are Commissioned Engineering Buildings Of The Planning Package No. 11.1. The Subject Of The Service To Be Excited Is Also The Local Construction Supervision. This Includes The Streets Listed Below With Subsequent, Expected Eligible Costs (Net): Peter-Fix-Str.: Engineering Structure 720,176.66 Eur, Traffic System 111,849.24 Eur; Hunsrückstraße: Engineering Building 52,113.46 Eur, Traffic System 35,874.40 Eur; Taunusstraße: Engineering Building 120,912.30 Eur, Traffic System 59,937.12 Eur; Westerwaldstraße: Engineering Building 83,111.08 Eur, Transport System Eur 86,295.50; Hemmesser Straße-Canal Repair, Section Peter-Fix-Straße To Hauptstraße: Ingenieurbesbauwerk 331,770.45 Eur, Traffic System 69,719.06 Eur. Performance Time: Creation Of The Preliminary Planning (Lp 2) Within 4 Months Of The Order Placement, And Based On The Numerical Number Of Individual Objects (Streets) Of The Engineering Buildings And Transport Systems, More Than Half Of The Preliminary Planning, Including Cost Estimates, Within 3 Months Of Ordering, Completion Of The Service Phase 6 In 14 Months After The Order Is Granted. Start Of Construction: 01. Quarter 2027.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.