The Subject Of The Order Is The Renovation Of The Roof Of An Annex Of The Statistical Office In Łódź. A Detailed Description Of The Subject Of The Contract Constituting Annex 1 To Swz Is Specified In The Design Documentation, Consisting Of:- Works Of Works- Annex 1 A To Swz,- Construction And Executive Design- Annex No. 1 B To Swz,- Technical Specification And Acceptance Of Works- Annex No. 1 C To Swz. The Offered Construction Works Must Meet The Requirements Of The Employer, Described In The Project Documentation, Technical Specifications Of The Execution And Acceptance Of Works, In Accordance With All Applicable Legal Acts, Competent For The Order, And On The Terms Contained In The Contract Template, Constituting Annex 6 To Swz. The Contractor Is Obliged In Particular To: A) The Establishment Of The Construction Manager (The Scope Of The Construction Manager Is Specified In Article 22 And Article 23 Of The Act Of July 7, 1994 - Construction Law (I.E., Journal Of Laws Of 2024, Item 725, As Amended), B) The Application Of The Act Of 7 July 1994. - Construction Law (I.E., Journal Of Laws Of 2024, Item 725, As Amended), C) The Application Of The Regulation Of The Minister Of Infrastructure Of June 23, 2003 On Information On Safety And Health Protection As Well As A Safety And Health Protection Plan (Journal Of Laws Of 2003 No. 120, Item 1126), D) Applying Other Provisions Aimed At Maintaining Health And Health And Safety At Work And Health And Life. Performing Works Covered By This Order, In Particular The Regulation Of The Minister Of Labor And Social Policy Of September 26, 1997. On General Health And Safety Regulations - (Journal Of Laws Of 2003, No. 169 Item 1650, As Amended), E) Assurances During Construction At The Construction Site Within The Limits Provided By The Contracting Authority Of Proper Order And Order, Compliance With Health And Safety Regulations, Maintaining The Area In A Free State Of Communication Obstacles (Including Entrance Protection), Removing Unnecessary Materials, Waste And Garbage, Including The Costs Of Their Exports, F) Having Liability Insurance For A Minimum Of Pln 250,000.00, Including The Subject Of Construction Activities, Throughout The Implementation Of The Contract; The Contractor Undertakes To Extend The Validity Of The Civil Liability Policy Until The End Of The Contract, G) To Report To The Supervision Inspector The Deadline For Completing Works Subject To Coverage. Unless The Contractor Does Not Fulfill This Obligation, It Is Obliged To Discover These Works Or Perform The Appropriate Vacuuming Or Holes Necessary To Examine The Works Performed, And Then Restore Them To The Previous State At His Own Expense. The Contracting Authority Receives The Works Referred To Above Within 3 Business Days From The Date Of Notification, H) Enabling Access To The Construction Site For Employees Of The State Building Supervision Authorities And Providing Them With The Necessary, Required Documents, I) In The Event Of Damag