1. Description Of The Subject Of The Contract. The Subject Of The Contract Is The Implementation Of Project Documentation And The Implementation Of Construction And Assembly Works Based On The Modernization Of The Historic Rybaczówka Located In The Górnik Park In Siemianowice Śląskie1.2. A Detailed Description Of The Subject Of The Contract Includes: A) Functional And Utility Program With Attachments (Add-On No. 3 To Swz), B) The Designed Contract Provisions (Addition No. 4 To Swz), C) Hereinafter Referred To As Documentation. 1.3. For The Subject Of The Contract, The Selected Contractor Will Grant The Contracting Authority A Guarantee And Warranty For A Period In Accordance With The Contractors Offer, But Not Shorter Than 60 Months From The Day Of The Day After The Day Of The Protocol Collection Without Reservations Of The Entire Subject Of The Contract. 1.4. The Contracting Authority Described The Subject Of The Order Without Indicating Trademarks, Patents Or Origin, Source Or Special Process That Characterizes The Product Or Services Provided By A Specific Contractor. If The Contractor Finds That The Subject Of The Contract Was Described In The Manner Referred To In Article 99 Para. 5 Of The Act, I.E. The Origin (Brand, Trademark, Manufacturer, Supplier) Of Materials Was Indicated, And The Criteria Used To Assess The Equivalence Were Not Given, He Should Ask The Employer To Indicate What Criteria Will Be Used To Assess Equivalence. 1.5. If The Documentation Constituting A Detailed Description Of The Subject Of The Contract Includes References To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Para. 1 Point 2 And Para. 3 Of The Pzp Act, The Contracting Authority Allows Equivalent Solutions Described. The Use Of A Given Standard, Technical Assessment, Technical Specifications And Technical Reference System In The Documentation Is Only Intended To Clarify The Level Of Expectations Of The Employer In Relation To A Specific Material/Device/Product. 1.6. The Employer Does Not Reserve The Possibility Of Applying For The Award Of The Contract Only By The Contractors Referred To In Art. 94 Of The Public Procurement Law, I.E. Having The Status Of A Sheltered Workshop, Social Cooperatives And Other Contractors Whose Main Purpose Or Main Purpose Of Their Organizationally Separated Units That Carried Out Orders, Is Social And Professional Integration Of Socially Marginalized People. 1.7. The Contracting Authority In The Description Of The Subject Of The Contract Took Into Account The Requirements For Availability For Disabled People And Design For All Users Referred To Art. 100 Para. 1 Pzp.1.8. The Contracting Authority In The Description Of The Subject Of The Contract Did Not Specify The Requirements For The Efficiency Or Functionality Referred To In Art. 101 Para. 1 Point 1 Of Pzp.1.9. The Employer Does Not Demand A Label From The Contractor And Does Not Indicate The Requirements Of A Spe
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.