Modernization Of Bus Stops In The Commune Of Stawiguda1. The Subject Of The Contract Is The Modernization Of 14 Bus Stops In The Following Range: 1) Making Hardening Of The Surface For Planned Sheds In 5 Locations In Accordance With The Notifications Of Other Construction Works. 2) Assembly 13 Pcs. Viat3) Installation 3 Pcs. Bicycle Repair Station4) Installation Of The Set Of 4 Bicycle Racks2. Requirements: 1) Hardening The Surface Of The Surface For The Installed Viastuting Should Be Carried Out In Accordance With The Location Indicated In The Documentation, After The Authorized Surveyor Is Marked Out. The Hardened Surface Area Is To Have The Following Structure: Concrete Rim 8X30x100 Cm For Cement-Sand Bed 1: 4 5 Cm, Concrete Benches With Resistance 10 Cm-C/12/15; Gray-Free Concrete Surface In Gray 8 Cm On Cement-Sand Bed 1: 4 3 Cm, The Basic Foundation Of The Klsm 0/31.5 15 Cm, 10 Cm Sand Drainage Layer. After The Hardening, The Map With As -Built Measurement Should Be Made. 2) Stop Sheds: A) Dismantling Of Two Existing Steel Shelters And Demolition Of Masonry Shelter With Utilization) Delivery And Assembly Of 7 Pcs. 1.4 X 2.7 M (With A Tolerance Of ± 10%) In The Place Indicated By The Contracting Authority, The Load-Bearing Structure Made Of Steel Profiles Closed With Square And Rectangular Cross-Sections, Galvanized Hot-Dip Galvanized After Technological Processes Of Production, Curtain Walls (Rear And Side) Filled With Safe Tempered Glass 6-8 Mm Thick, Roof Filled With A Compressed-Compound Darkened Ltc Brown With A Uv Filter, Seat In The Form Of A Bench Made Of Wooden Panels Along The Entire Length Of The Shelter, Panels Protected Against Atmospheric Factors, The Shelter Was Powder Painted In Ral 6018; The Product Must Have A Declaration Of Utility Properties In Accordance With The Pn-En 1090-1+A1: 2012 Standard And Marking With The Cec Sign) Delivery And Assembly 6 Pcs. Przystanzkowych Cantileas With A Length Of 3 M (With Tolerance ± 10%) In The Place Indicated By The Contracting Authority, Side Walls Without Filling 0.3 M Roof 1.2 M (With A Tolerance Of ± 10%), A Supporting Structure Made Of Steel Profiles Closed With Square And Rectangular Cross-Sections, Hot-Dip Galvanized After Production Technological Processes, A Rear Wall Filled With A 6-8Mm Thick Tempered Glass, Arched Roof, Covered With Cellular Polycarbonate With A Tinted Ltc, Seat In The Form Of A Bench Made Of Wooden Shelters Along The Entire Length Of The Shelter, Varnished With Colorless Varnish Protecting Against Weather Conditions, The Shelter Structure Was Powder Painted In Ral 6018; The Product Must Have A Declaration Of Utility Properties In Accordance With The Pn-En 1090-1+A1: 2012 Standard And Marking With The Ce Sign, D) After Assembly, The Shelter Should Be Made With A As-Built Measurement. 3) Bicycle Repair Station And Installation Of 3 Bicycle Repair Stations In The Place Indicated By The Ordering Party. The Station Is Made Of Galvanized Steel Powder -Painted With
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.