1. The Subject Of The Contract Is The Conclusion Of A Framework Agreement Specifying The Conditions For The Performance Of Future Orders For Construction Works Consisting In The Execution Of Pavements, Bus Bays Along Poviat Roads In The Jelcz-Laskowice Commune, Within 7 Months From The Date Of Signing The Framework Agreement. 2. The Framework Agreement Will Include The Successive, Adapted To The Current Demand Of The Employer, Execution Of Pavements, Bus Bays In The Poviat Road Belt In The Jelcz -Laskowice Commune In The Following Range: Section 1. Making The Pavement Of A Concrete Cobblestone In An Amount Of 444.0 M2 Consists Of: - Correct Cement Stabilized Soil- Concrete Cube 8 Cm- Laying Of Concrete And Stone Curbs- Laying Of Concrete Edges 8X30 Section 2. Accompanying Works Consist In:- Dismantling The Surface From The Surfaces Of Mineral And Bituminous Mixtures. 4-8 Cm- Dismantling The Surface From The Stone Crushed Stone With A Thickness Of 20 Cm- Dismantling The Surface From The Stone Cube- Dismantling Of Pavements, Stop Islets And Pedestrian Crossings From 35X35x5 Cm Concrete Tiles- Dismantling Of Stone Curbs- Dismantling Concrete Curbs- Dismantling Of The Edge- Execution Of Street Sewage Wells- Vertical Adjustment Of The Vertical Telephone Well Coads For Water And Gas Valves- Vertical Adjustment Of Channel Manholes- Vertical Adjustment For Street Sewage Grates- Vertical Adjustment Of The Street Sewage Grates- With Replacement Of The Manhole- Making The Channel With Pvc Pipes- Replacement Of The Container- A Track Of The Street Sewage- Performing The Lawn- Digestive Sewage 3. In Addition, The Scope Of The Subject Of The Contract Includes Linear Measurements, Marking Of Works, As -Built Maps. 4. Work On The Road Will Take Place In Accordance With Current Orders. Annex 2 Contains An Approximate Scope Of Work. 5. The Employer Reserves The Right To Change The Number Of Provided Work During The Implementation Of The Task Depending On The Current Needs Of The Ordering Party Or Financial Resources. 6. The Maximum Amounts Of Works Expected To Be Carried Out Based On The Framework Agreement Are Included In The Offer Cost Estimate Constituting Annex 2 To This Swz.7. For The Order, A Framework Agreement Will Be Concluded With One Contractor, On The Attitude Of Which The Contracting Authority Will Be Able To Grant The Contractor Of Executive Orders. 8. The Implementation Of Executive Orders During The Period Of The Framework Agreement Will Take Place On The Conditions Specified In The Framework Agreement, Which Is An Attachment To Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.