The Subject Of The Contract Is The Implementation Of Complete Construction And Executive Documentation For The Construction Of A Rural Common Room In Korczyn, Commune Strawczyn, Located On The Plot With Registration Number 443 Together With The Submission Of Documentation To The Poviat Eldership In Kielce In Order To Obtain A Building Permit And Supervision Of Authors Supervision During The Procedure Of Building A Building Permit And Subsequent Implementation Of The Investment. The Designer Should Take Into Account, Among Others. A Room For About 100 People2. Kitchen For 20 People Cooking 3. Magazine At The Kitchen4. Warehouses5. Mens Toilet6. Womens Toilet/Disabilities 7. Little Cloakroom8. Boiler Room With External Output9. Exit To The Terrace From The Main Room10. Land Development11. Parking12. Altana13. Place For A Bonfire/Grill 14. Planting15. Monitoring16. Lighting17. Solar18. Foundations 19. Drainage With Water Drainage20. Foundations 21. Anti -Insdimal Insulation 22. Heating 23. Ventilation And Air Conditioning Installations 24. Equipment Of Object 25. Necessary Reconstruction To Connect Objects26. Necessary Accompanying Infrastructure. The Design Documentation Should Be Preceded By A Preliminary Concept For The Contracting Authority. The Contractor Is Obliged To Take Into Account The Awards Of The Employer In The Concept Of The Project In Accordance With Applicable Regulations. The Recourse Is Subject To Approval By The Ordering Party Before Submitting The Application For A Building Permit. Specific Studies Included In The Project Documentation The Contractor Will Transfer To The Ordering Party In A Form That Prevents It From Preventing It From Accidental, Individual Pages/Card Should Be Numbered And Together With The Title Page The Whole, E.G. Binded/Sewn. The Costs Of Developing Documentation Should Include All Fees Related To Obtaining The Opinion Of Arrangements Necessary To Obtain A Building Permit. Design Works Should Be Carried Out To The Full Extent Necessary To Complete The Order And Obtain A Final Building Permit. Multi -Branch Design Study Should Include The Entire Scope Of The Investment Task Implemented. The Design Documentation Should Be Complete From The Point Of View Of The Purpose It Is To Serve And Meet The Requirements And Arrangements Specified By Law. Design Requirements Determining The Scope Of Technical Solutions And The Type Of Materials Used For The Implementation Of The Investment Are To Ensure: - Optimization Of Costs Of Implementation And Operation, - Use Of Modern Solutions In Facilities, - High Standard Of Safety Of The Use Of The Object, - Functionality Of Solutions, - Aesthetics, - Innovation, - Quality, - Usability, - Availability, - Energy Efficiency. 2. As Part Of The Subject Of The Contract, It Should Be Carried Out:- A Construction Project Made In The Scope And Form Necessary To Obtain A Building Permit Along With A Set Of Studies Required At This Stage, In Accordance With The Regulation Of The Minist
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.