Tenders Are Invited For Modernization Of Two Sports Complexes My Playground - Orlik 2012 At Ul. At Zalewo 1 And Ul. Wiejska 4 In Tarnobrzeg.

Tender Detail

94856211
BZP-I.271.17.2025
Self-Funded
Tenders Are Invited For Modernization Of Two Sports Complexes My Playground - Orlik 2012 At Ul. At Zalewo 1 And Ul. Wiejska 4 In Tarnobrzeg.
NCB
central europe
European Union
17-04-2025

Work Detail

Scope Of Works: 1) The Scope Of Modernization Of The Surface Of The Football Field. A. Replacement Of Synthetic Grass Surface On A Mineral Foundation From Aggregates By: A) Dismantling Of Existing Sports Equipment; B) Dismantling And Utilization Of Old Surfaces; C) Improvement Of The Foundation By Alignment And Thickening; D) Purchase And Assembly Of Synthetic Grass With A Height Of Not Less Than 60Mm Together With Assembly Materials; Delivery And Backfilling With Quartz Sand And Rubber Granules, G) Installation Of Sports Devices (Gates) Along With Replacing The Meshes With New Ones And The Painting And Supplementation Of The Hooks; H) Replacement Of The Rims With Metal Meshes For Basketball. Synthetic Grass Surface Should Meet The Following Parameters: A) Fiber Composition: Polyethylene (Pe) 100 %, B) Type Of Grass: Mix Of Monophilic Fibers Reinforced With A Core With Fibrilized Fiber, C) Height Of The Fibers - Min.60 Mmd) Monophilic Fiber Thickness - Min 300 Microns) Thickness Of Fibrilized Fiber - Min. 100 Micronówf) Weight Of The Fiber - Dtex - Min. 16,000G) Number Of Bundles - Min. 8,000 Pcs/M2h) Number Of Fibers - Min. 122,000 Pcs/M2i) Total Grass Weight - Min. 2 600Gr/M2j) Water Permeability (For The System) - Min 1 800 Mm/Hk) Strength Of Glued Connection After Aging: - Min 150 N/100 Mml) Bunning Torn Strength: - Min. 75 N Anti -Aging) Grass - Polyurethane Or Latex) Filling Of The Grass: Quartz Sand And Epdm Rubber Granules From Recycling In Accordance With The Guidelines Of The Synthetic Grass Manufacturer. 2) The Scope Of Lighting Modernization: A. Replacement Of The Transverse Lighting) Disassembly Of Existing Fertilizers For The Football Field; B) Installation Of Led Rays For The Football Pitch; C) Dismantling Of Existing Highlighters For The Multifunctional Pitch; D) Installation Of Led Iron Lighting For The Multifunctional Pitch. The Modernization Of The Lighting Will Consist In The Replacement Of Halogen Fertilizers For Led.C. The New Lighting Must Meet The Requirements Specified In The Pn-En 12193 Light And Lighting-Lighting In Sport In The Range: A) Lighting Class Min. Ii; B) Medium Lighting Intensity Min 200 Lx; ​​.C) Uniformity Min 0.6; D. In Addition, The Lighting Luminaire Should Have: A) The Housing Made Of High -Pressure Aluminum Casting With A Toughened Glass Led Cover; B) The Degree Of Ip Tightness (Protection Against Moisture And Dust) - Min. Ip65; C) Ik Impact Resistance - Min. Ik08; D) Color Temperature Tc - 4000 K. E. The Cables In The Lighting Pole Should Be Replaced With The Base Of The Fuses. F. After Completing The Assembly Works, N.W. Measurements: A) Ground Resistance Measurement; B) Measurement Of Short Circuit Loop Resistance; C) Measuring Insulation Resistance; D) Measurements Of The Level Of Lighting In Order To Compare With Photometric Calculations.G. Modernization Of Electrical Switchgears By Replacing Excessive Current Switches, Switches, Contactors, Contact Slats And Cables. 3) Execution And Assembly Of T

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail