1 The Current Control System Allows You To Control Devices On Two Shots Using The Existing Steering Panel. 2. Integrating New Turbidity Of Nettle (2 Pcs Of Submersion Of The Probe) And Sewerynówka (1 Pcs Immersion Probe) Suw Black Water (1 Pcs. Narchy) And With An Existing Control System Located On The Pole Stroke (Objects, Intake Of Połonina And Sewe-Rynówka Distant From The Suw, About 3.5 Km, Connected With A Fiber Network). No Connection To The Black Water Stroke. 3. Slurmeters Of Factory New, Working In The Range From 0-Min 250 Ntu As Immersed In The Canopy Of The Surface Shot Tank (Turbidity Is Allowed Through Photometric Probes Supplied With Complete Equipment) And One Narrow. Objects On Which The Mutbulate Assembly Is Planned Have Stations Enabling Them To Be Installed After Adapting. The Supplied Devices Must Be Equipped With Analog Output That Will Allow You To Integrate With The Existing System, Mu-Si Housing, Allow You To Operate Outside, The Housing Of Ip684. Starting The Automatic Closing System Of The Gate On The Surface Approach To The Po-Krzywa In Case Of A Rapid Increase In Water Turbidity. The Surface Intake Of Nettle Has At The Inlet To The Canopy Of The Dam Piling A Three-Spanted Weir Equipped With Slopes (Stood) Made Of Electrically Powered Steel And Controlled Both From The Very Intake And From The Water Treatment Station Of The Pole Water. The Task Is To Launch The Control System And Automation Addictive Work Of Three -Spanic Weir On The Turbulence Of Water Entering The Intake. 5. Execution Of A Block Of Automation On A Pole Stroke Adding Automatic Closing Of The Water Supply From The Time Of The Sediment From Separators. The Task Is To Adapt The Existing Automation System To The Work Of The Połonina Water Treatment Station Where, In An Automatic Way, The Water Flow From The Intake Of Nettle Will Be Limited To The Time Of Depotting Sediment From Separators To Reduce Pressure Jumps. 6. Delivery Of A Remote Servicing System For Podonina Stroke Control And Water Intakes. The Task Aims To Enable Access To Remote Service Assistance, The Employer Will Allow Access To The Internet Only On The Pole Stroke Connected To Two Shots Of Fiber Optic Network. 7. Expansion Of The Monitoring Of The Video Water Treatment Station In Szczawnica And Jaworki. Zada-It Does Not Involve The Implementation Of Video Monitoring On Połonina Suw-Szczawnica (3 Cameras) And Black Water Suw-Jaworki (2 Cameras), Recording From The Cameras Must Be Recorded And Access To Monitoring And Its Control Must Take Place From The Headquarters Of The Contracting Authority, I.E. Ul. Profession 19C Szczawnica. Cameras Equipped With Infrared And Motion Sensor And Tracking Function. Resolution Min 2 Mpx. 8. Replacement Of The Aggregate With The Ups System At The Black Water Treatment Plant In Jaworki. A New Device Enabling The Uninterrupted Operation Of The Water Treatment Plant During Interruptions In The Supply Of Electricity, The Need For Installation Together With The
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.