Ventilation Installation Work – Step Dorbe - Installation De Ventilation Cfc244. The Purpose Of This Doffre Call Is To Designate A Business In Charge Of Design (Detail Engineering), Supply, Delivery, Assembly And Commissioning (Including Performance Included) Of The Equipment Necessary For The Ventilation Of The Step Dorbe. The Main Characteristics Of Linstallation Are Those Of The Air Treatment Of Each Step Building With The Requirements Of The Sia Standard. The Materials Of The Installations Were Taken Into Account According To The Environment Of The Premises.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.