1. The Subject Of The Contract Is The Implementation Of The Task Entitled: Construction Of Bicycle Paths In The Ślesin Commune. The Task Carried Out In The Formula Design And Build. Relialization Of The Subject Of The Contract Has Been Divided Into The Following Stages: 1) Stage 1 - Including The Implementation Of Project Documentation; 2) Stage 2 - Including Construction Works Together With As -Built Documentation. The Operation Includes The Construction Of A Bicycle Path Along With The Infrastructure Accompanying In The M. Różopole. Parameters Of The Bicycle Path Built:-Bicycle Path Service: 653 M,-Service Of Rainwater Sewage: 444 M,-Minimal Number Of Control Wells: 14 Pcs,-Minimum Number Of Rainfalls: 13 Pcs.,-Path Width: 2.5 M, -Dire Path: Asphalt,-Road Surface And Widening Asphalt, Aggregates, -Erations Of The Road Lane: Vertical Marking, Horizontal Marking, U-12A Protective Barriers,-Bus Route. As Part Of The Task, The Following Will Be Performed:-Processing Project Documentation And As-Built Documentation,-Consultation Of Detailed Technical Specifications Of The Implementation And Receipt Of Works,-To Obtain The Required Decisions, Opinions, Arrangements And Permits, Applications,- Construction Bicycle Path,-Removal Of Rainwater Sewage System Together With Inlets;-Making Authors Supervision Over The Implementation Of The Investment. A Thin-Like Description Of The Subject Of The Contract, Description Of The Requirements Of The Employer In The Field Of Implementation And Acceptance Was Specified In The Functional And Use Program, Hereinafter Referred To As Pfu Constituting Annex No. 9 To Swz And Consideration Of Estimates. 1.1 The Economic Educator Will Be Obliged: 1) On The Basis Of The Existing State Presented In Pfu And In Accordance With The Requirements Of The Employer Regarding The Design And Performance Of A Bicycle Path In The M. Różopole, To Perform Project Documentation Together With Obtaining All Arrangements, Opinions, Permits And Decisions; 2) Refer To The Implementation Of The Subject Of The Contract Persons With Necessary Powers, Experience And Knowledge; 3) Fulfill The Task With The Task Of Equality And Instead The Principle Of Equality Of Women And Men, As Well As Ensuring A Consistent Approach In This Area Under Programs And Projects Co-Financed From Eu Funds For 2021-2027, Availability Standards For Cohesion Policy 2021-2027 And The European Funds Program For Wielkopolska 2021-2027, In Accordance With The Employer And Approved By The Ordering Part Technical. The Contractor Will Implement The Task Based On Applicable Regulations, In Particular The Construction Law Act Together With Enforcement Provisions And The Eu Basic Rights Card And The Convention On The Rights Of Disabled People; 4) When Designing, Apply Provisions To Ensure Accessibility To All Persons, Including Persons With Special Needs By Applying Universal Design Or Rational Improvements Referred To In The Act Of 19 July 2019 On Ensuring Availability Of Persons W
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.