The Subject Of The Order Is: Renovation Of The Marina Hilgendorf And Expansion Of The Bosun. The Investment Is Included In: 1. Renovation Of Wooden Floating Platforms At The Marina Capt. R. Hilgendorf In Stepnica. The Basic Renovation Works Will Apply To Span Bridges. The Breakdown Of The Breakdown Is Expected To Replace Wooden Feces, Polyurethane Fenders. Due To The Deteriorating Condition Of Wooden Span Bridges, Resulting From The Long -Term Direct Impact Of Environmental Conditions, It Was Decided To Replace Them With Elements Resistant To These Conditions. Replacement Is Designed:-Wooden On-Board Boards On The Platforms And Descent Routes On The Platforms, On Composite Bridge Boards,-Wooden On-Board Boards On Y-Booms, For Steel Platform Grates,-Wooden Load-Bearing Beams Of The Decks, For Steel Cold-Headed Censor,-Wooden Fertile Beams, At Polyurethane Metropolitans. 3 The Investment Will Be Accompanied By The Construction Of Paved Surfaces For Pedestrian Access To The Facility.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.