1. Full Name Of The Task: Removal Of Damage Caused By The Movement Of A Mining Plant, In Road Surfaces, Pavements, Engineering Facilities, Road Infrastructure And Infrastructure Used To Receive Rainwater And Snowmel Road Surfaces And Infrastructure In The Bytom Commune In 2025. 2. The Subject Of The Contract Is The Removal Of Damage Caused By The Movement Of The Mining Plant In Road Surfaces, Pavements, Engineering Facilities, Road Infrastructure And Infrastructure For The Reception Of Rain And Snowmelt In The Bytom Commune In 2025. 3. The Subject Of The Contract Includes: I. Road And Pavement) Partial Renovation Of Bituminous Surface Up To 5 M2, Including The Arrangement Of 50 Mm X 10 Mm Bituminous Tape On The Surface Contacts, B) Mechanical Demolition Of The Bituminous Surface 10 Cm + Cutting With A Mechanical Saw Of Bituminous Surface To A Depth Of 6 To 10 Cm, C) Manual Arrangement Of The Bituminous Surface Of The Gr. 5 Cm. (W-Wa Binding), D) Manual Arrangement Of Bituminous Surface Gr. 5 Cm. (Wo-Abrasive) With The Arrangement Of 50 Mm X 10 Mm Bituminous Tape On The Surface Contacts, E) Mechanical Arrangement Of The Bituminous Surface Of The Gr. 5 Cm. (W-Wa Bigning), F) Mechanical Arrangement Of The Bituminous Surface. 5 Cm. (Wo-Abrasive) With A 50 Mm X 10 Mm Bituminous Tape On Surface Contacts, G) Milling Of Bituminous Surface With A Thickness Of Up To 10 Cm, H) Vertical Adjustment Of Street Sewage Grilles, I) Vertical Adjustment Of Channel Manholes J) Vertical Adjustment Of The Wells For Water And Gas Valves, K) Vertical Adjustment Of Teletechnical Wells, L) Making A New Undercoat With Corriso 6X20 Cm, N) Moving The Concrete Edges 6X20 Cm Or 8X30 Cm, O) Dismantling Of A Concrete Curb 15X30 Cm, P) Laying A New Concrete Curb 15X30 Cm On A Concrete Bench With Resistance, Q) 15X30 Cm Or 20X30 Cm + Plain Concrete Bench, P W-Wo 20 Cm, T) Partial Renovation Of The Pavement Surface From: 5X7 Cm Stone Cubes, So-Called Mosaics Or Irregular Stone Cubes Up To 9X11 Cm, Stone Cube 100% Recovery, U) Partial Renovation Of The Pavement Made Of Concrete Cube Gr. From 6 Cm To 8 Cm Or Made Of Concrete Slabs From 30X30 Cm. Up To 50X50 Cm Concrete Material 75% Recovery, V) Renovation Of The Pavement Of The Concrete Cube Of The New Gr. 8 Cm. Gray On Cement-Sand Bed, In) Flooding Of Crevices. Organization Of Traffic (Emergency Protection Until The Removal Of Damage And During The Works Related To Their Removal) A) Temporary Setting Of The Road Mark (Percentage Share Of Material + Assembly And Disassembly) Characters From The Group A900, B And C 800, D600, D600, B) Temporary Setting Of The Post To The Road Mark From Groups A900, B And C 800, D600 Or Plate (Percentage Of Material Disassembly), C) Temporary Setting Of The U-21A/B Road Gauge Based On Rubber (Percentage Of Material + Assembly + Dismantling), D) Temporary Setting Of Road Dams U-20A/B, U-20C, U-3C/D With Bars Based On Rubber (Percentage Of Material + Assembly + Dismantling), E) Temporary Setting Of A Road