Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
24-03-2025
Work Detail
Quotation are invited for Supply of Cable Glands, Sleeves, Lugs, Ferrules, Cable Trays, Supporting Stan DS & Terminal Blocks. JOB SCOPE:1.#SITE VISIT TO UNDERSTAND THE WORK SCOPE.2.#SUPPLY OF CABLE GLANDS, SLEEVES, LUGS, FERRULES, CABLE TRAYS,SUPPORTING STAN DS & TERMINAL BLOCKS # MISCELLANEOUS3.#LAYING THE CABLES FROM T-3000 SIEMENS CONTROL PANELS LOCATED IN LCRTILL FIELD JB/ INSTRUMENTS 4.#TERMINATION OF CABLES ON T-3000 SIEMENS MARSHALLING5.#BACK WIRING OF CABLES TO T-3000 SIEMENS CONTROL SYSTEM CARDS (EXPERTWORKMAN SHIP IS REQUIRED)6.#INSTALLATION OF JBS IN THE FIELD WHICH INCLUDES CONCRETE BASE,SUPPORTING STAND & CABLE TRAYS7.#TERMINATION OF C ABLES ON FIELD SIDE INSTRUMENTS/ JBS8.#LOOP CHECKING OF CABLE CORES TERMINATED9.#TESTING & COMMISSIONINGSPECIAL REMARKS ON SCOPE OF WORK AND REQUIREMENTS (COMMON)1.#QUOTATION ACCEPTANCE: ONLY QUOTATIONS SUBMITTED BY VENDORS WHO HAVEVISITED THE SITE AND EVALUATED T HE WORK SCOPE WILL BE CONSIDERED FORACCEPTANCE.2.#WORKMANSHIP: ALL WORKMANSHIP ASSOCIATED WITH THIS PROJECT SHALL BETHE RESPONSIBILI TY OF THE CONTRACTOR.3.#CONTRACTOR EXPERTISE: THE CONTRACTOR MUST DEMONSTRATE EXPERTISE INSIMILAR TYPES OF WORK AND HAVE PREVIOUS EX PERIENCE IN EXECUTING SIMILARPROJECTS.4.#WORK DURATION & SHUTDOWN: THE WORK CAN BE CARRIED OUT DURING THEUNIT SHUTDOWN, WITH A MAXIM UM OF 2 DAYS ALLOCATED FOR THE COMPLETION OFTHE WORK. ANY FABRICATION REQUIRED FOR THE PROJECT SHOULD BE READILYAVAILABLE. DEWA WILL PROVIDE A MINIMUM OF 3 DAYS# NOTICE PRIOR TO THESHUTDOWN OF THE PLANT.5.#SUPPORT FROM DEWA: DEWA WILL PROVIDE THE 32 CORE CABLES, J UNCTIONBOXES & THE NECESSARY ELECTRICITY, WATER, SCAFFOLDING, FORKLIFT, ANDCRANE (IF REQUIRED) FOR THE EXECUTION OF THE WORK.6.#MISC ELLANEOUS ITEMS: THE CONTRACTOR SHALL PROVIDE ALL NECESSARYMISCELLANEOUS ITEMS, INCLUDING BUT NOT LIMITED TO LUGS, GLANDS, FLANGES,B OLTS, NUTS, SUPPORTING STANDS & AND OTHER MATERIALS REQUIRED FOR THEPROPER EXECUTION OF THE WORK.7.#HOUSEKEEPING & DISPOSAL: THE CON TRACTOR IS RESPONSIBLE FORMAINTAINING CLEANLINESS AT THE WORKSITE AND FOR THE PROPER DISPOSAL OFALL SCRAP MATERIALS.8.#WARRANTY: A W ARRANTY PERIOD OF ONE (1) YEAR IS REQUIRED FOR BOTH THESUPPLY AND SERVICES PROVIDED.9.#SITE PHOTOS: DEWA DOES NOT PROVIDE PHOTOGRAPH S OF INSTALLEDSWITCHES. CONTRACTORS ARE REQUESTED TO REFRAIN FROM REQUESTING SUCHIMAGES.PLEASE CONTACT:MOHAMMED THOUSEEFMOHAMMED.THO USEEF@DEWA.GOV.AE0558178703 Qty: 1 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332500713)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.