Construction Project Management Services - New Central Clinic - 2Nd Construction Phase Project Control. A Replacement Building For The Operational Center (B 22) Is Planned As A 2Nd Construction Phase Of The New Central Clinic. A New Central Building For Operational Subjects With Central Surgery, Intensive Care, General Care, Outpatient Clinic And Radiology Is To Be Built. The New Building To Be Planned Is Developed In The Structural And Functional Connection With The New Heart Center (B 25) Of The Ukb (Central Clinic 1. Ba) And Is Built On The Construction Of The Current Building Of The Medical Clinic (B 26), Which Is Dismantled In Advance. The Following Functional Areas Are Planned In The Room Program With Currently 17,789 M2 Usable Space: Central Surgery With 21 Surgical Halls, Intensive Care Capacities With 48 Beds, Outpatient And Doctoral Service Areas Of The Operational Subjects, Supplementing Central Radiology With Ct And Mri Diagnostics As Well As General Care Areas With 130 Beds. The Building Concept Comprises The Ground Floor And Four Upper Floors, As Well As A Basement. Energy Efficiency And Sustainability Will Receive A Special Role In The Conception Of The New Building. In Addition To The Structural And Structural Optimization, An Improvement In The Entire Energy Efficiency Of The Building By At Least 10 % Compared To The Threshold For The Requirements For Lowest Energy Building Set In National Measures Will Be Specified. In Addition, Certification According To Bnb Is To Be Achieved In Silver For The Building. Commissioning Project Control May 2025 Planning Central Clinic 2.Ba Planning Start June 2025 Preliminary Planning 3./4. Quarter 2025 Design Planning 1./2. Quarter 2026 Submission Hu-Bau June 2026 Submission Building Application July/August 2026 Demolition Building B 26 Middle To The End Of 2027 New Central Clinic 2Nd Ba Construction In Early 2028 The Project Control Should Start Your Work Immediately After Placing The Order. The Aim Is To Sign The Project Management Before Commissioning The Relevant Planning Disciplines. Thus, The Project Control In The Final Phases Of The Awarding And Negotiation Procedures On The Object And Specialist Planner Services Should Actively Participate. Equal Framework The Ukb Has Defined A Cost Framework For The Entire Construction Work. The Forecast Construction Costs (Kg 100-600) Amount To Around 235 Million Euros. This Is A Cost Limit That Must Be Observed Across All Cost Groups, Otherwise The Financing Of The Overall Project Is Not Guaranteed. The Task Of The Project Management Is Therefore To Implement The Project Within The Costs Mentioned And To Develop Solution Strategies For Compliance With The Costs In Close Coordination With The Later Users Of The Building, The Specialist Engineers And The Project Management Of The Ukb. Building Information Modeling -Bim The Entire Construction Project Is Planned Using The Bim Planning Method. The Performance Profile Of Project Control, As Well As The Performance Images Of The Individual Planning Disciplines, Are Corresponding Requirements And Partial Services
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.