1. The Subject Of The Contract Is: 1) Remove Damaged, Threat Of Security Elements Of Playground Equipment And Replace Them With New Ones, Remove Damage To The Elements Of Play Equipment By Carrying Out Their Repairs; 2) During Renovation Works, Determining The Works Zones Renovated By Securing The Square Or Part Of It With Remuneration; 3). The Date Of Taking The Photo) - With Visible Repaired Places/Elements; 4) The Contractor Should Have A Storage Room Adapted For Storing Dismantled Play Devices/Exercise Equipment Or Their Elements, Suitable For Further Operation. 5) The Contractor Should Have Basic Knowledge Of The Requirements Of Pn -En 1176 And 1177 Standards Persons With Construction Qualifications In A Construction And Construction Specialty For Managing Construction Works To A Limited Extent Or Corresponding To Them Equivalent Building Qualifications In Accordance With The Construction Law, Which Were Issued On The Basis Of Previously Applicable Provisions In The Extent Necessary To Carry Out The Task In Playgrounds And Sports And Recreation Complexes. The Goal Is To Ensure Health And Life Of Playground Users. Removing Damage Posing A Threat To Safety Within 1 Hours Of Telephone Or E-Mail (From 6:00 To 22:00 On All Days Of The Week); 7) Guaranteeing Availability In Terms Of Participation In The Examination Of The Playground Square, When The Contracting Authority Reports Such A Need; 8) Providing The Contact Number (Available From 6:00 Am); 9) Dispositions Determining The Scope Of Work To Be Carried Out In The Form Of A Telephone Conversation, E-Mail, Sms; 10) The Waste Manufacturer Arising During The Performance Of Entrusted Obligations Is The Contractor. Management Of Produced Waste As A Result Of The Performance Of Entrusted Obligations Should Be Carried Out In Accordance With Applicable Law; 11) The Collected Waste Is Not Allowed To Be Reached In The Entrusted Area. They Should Be Removed On An Ongoing Basis During And After Their Completion; 12) Materials And Elements Used To Repair Play And Sports And Recreation Devices Should Meet The Requirements Of Products Approved For Marketing And Use In Construction And Should Be Identical In Terms Of Appearance And Technical Characteristics With Used On Existing Devices; 13) The Contractor Is Obliged To Inform The Contracting Authority About The Date Of The Completion Of The Commissioned Work. Before The Date Of Receipt Of These Works. 2. A Detailed Description Of The Subject Of The Contract Is Included In Annex I.4 To Swz. 3. The Detailed Scope Of Work Was Specified In The Offer Cost Estimate Constituting Annex I.6 To Swz, Which Should Be Submitted Together With The Offer In Accordance With Point 6.1.10) Swz.4. The Contractor Divides The Warranty For A Period Of Min. 12 Months From The Date Of Receipt Of The Repair. Note: An Additional Warranty For Repairs (Warranty Extension Period) Is Scored In Accordance With The Criterion For Assessing The Offers Specified In Point 30.2. Swz.5. The Emplo
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.